Growth Metrics

Ultralife (ULBI) Construction in Progress (2016 - 2018)

Ultralife has reported Construction in Progress over the past 8 years, most recently at $2.9 million for Q4 2018.

  • Quarterly results put Construction in Progress at $2.9 million for Q4 2018, down 44.12% from a year ago — trailing twelve months through Dec 2018 was $2.9 million (down 44.12% YoY), and the annual figure for FY2018 was $2.9 million, down 44.12%.
  • Construction in Progress for Q4 2018 was $2.9 million at Ultralife, down from $5.1 million in the prior quarter.
  • Over the last five years, Construction in Progress for ULBI hit a ceiling of $5.1 million in Q4 2017 and a floor of $170000.0 in Q4 2016.
  • Median Construction in Progress over the past 5 years was $1.4 million (2014), compared with a mean of $1.9 million.
  • Biggest five-year swings in Construction in Progress: plummeted 86.68% in 2015 and later skyrocketed 2921.18% in 2017.
  • Ultralife's Construction in Progress stood at $1.4 million in 2014, then plummeted by 86.68% to $180000.0 in 2015, then fell by 5.56% to $170000.0 in 2016, then skyrocketed by 2921.18% to $5.1 million in 2017, then plummeted by 44.12% to $2.9 million in 2018.
  • The last three reported values for Construction in Progress were $2.9 million (Q4 2018), $5.1 million (Q4 2017), and $170000.0 (Q4 2016) per Business Quant data.