Growth Metrics

EnerSys (ENS) Construction in Progress (2017 - 2019)

EnerSys (ENS) has disclosed Construction in Progress for 9 consecutive years, with $54.3 million as the latest value for Q1 2019.

  • Quarterly Construction in Progress rose 8.77% to $54.3 million in Q1 2019 from the year-ago period, while the trailing twelve-month figure was $54.3 million through Mar 2019, up 8.77% year-over-year, with the annual reading at $54.3 million for FY2019, 8.77% up from the prior year.
  • Construction in Progress for Q1 2019 was $54.3 million at EnerSys, up from $49.9 million in the prior quarter.
  • The five-year high for Construction in Progress was $54.3 million in Q1 2019, with the low at $33.4 million in Q1 2017.
  • Average Construction in Progress over 5 years is $44.4 million, with a median of $48.9 million recorded in 2015.
  • The sharpest move saw Construction in Progress fell 27.49% in 2016, then soared 49.32% in 2018.
  • Over 5 years, Construction in Progress stood at $48.9 million in 2015, then dropped by 27.49% to $35.4 million in 2016, then fell by 5.73% to $33.4 million in 2017, then skyrocketed by 49.32% to $49.9 million in 2018, then rose by 8.77% to $54.3 million in 2019.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $54.3 million, $49.9 million, and $33.4 million for Q1 2019, Q1 2018, and Q1 2017 respectively.