Growth Metrics

Tetra Technologies (TTI) Construction in Progress (2016 - 2025)

Tetra Technologies filings provide 17 years of Construction in Progress readings, the most recent being $90.9 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 160.42% to $90.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $90.9 million, a 160.42% increase, with the full-year FY2025 number at $90.9 million, up 160.42% from a year prior.
  • Construction in Progress hit $90.9 million in Q4 2025 for Tetra Technologies, up from $66.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $90.9 million in Q4 2025 to a low of $955000.0 in Q1 2021.
  • Median Construction in Progress over the past 5 years was $10.0 million (2023), compared with a mean of $21.5 million.
  • Biggest five-year swings in Construction in Progress: tumbled 96.14% in 2021 and later soared 768.9% in 2022.
  • Tetra Technologies' Construction in Progress stood at $5.3 million in 2021, then soared by 43.2% to $7.7 million in 2022, then soared by 34.77% to $10.3 million in 2023, then skyrocketed by 238.18% to $34.9 million in 2024, then soared by 160.42% to $90.9 million in 2025.
  • The last three reported values for Construction in Progress were $90.9 million (Q4 2025), $66.8 million (Q3 2025), and $53.0 million (Q2 2025) per Business Quant data.