Tetra Technologies (TTI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Tetra Technologies (TTI) over the last 17 years, with Q3 2025 value amounting to $66.8 million.
- Tetra Technologies' Construction in Progress rose 13471.22% to $66.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $66.8 million, marking a year-over-year increase of 13471.22%. This contributed to the annual value of $34.9 million for FY2024, which is 23817.69% up from last year.
- As of Q3 2025, Tetra Technologies' Construction in Progress stood at $66.8 million, which was up 13471.22% from $53.0 million recorded in Q2 2025.
- Tetra Technologies' Construction in Progress' 5-year high stood at $66.8 million during Q3 2025, with a 5-year trough of $955000.0 in Q1 2021.
- Its 5-year average for Construction in Progress is $17.8 million, with a median of $9.7 million in 2023.
- In the last 5 years, Tetra Technologies' Construction in Progress crashed by 9614.3% in 2021 and then soared by 76890.05% in 2022.
- Quarter analysis of 5 years shows Tetra Technologies' Construction in Progress stood at $5.3 million in 2021, then surged by 43.2% to $7.7 million in 2022, then skyrocketed by 34.77% to $10.3 million in 2023, then skyrocketed by 238.18% to $34.9 million in 2024, then soared by 91.46% to $66.8 million in 2025.
- Its last three reported values are $66.8 million in Q3 2025, $53.0 million for Q2 2025, and $41.4 million during Q1 2025.