Growth Metrics

Tetra Technologies (TTI) Construction in Progress (2016 - 2025)

Tetra Technologies' Construction in Progress history spans 17 years, with the latest figure at $90.9 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 160.42% year-over-year to $90.9 million; the TTM value through Dec 2025 reached $90.9 million, up 160.42%, while the annual FY2025 figure was $90.9 million, 160.42% up from the prior year.
  • Construction in Progress reached $90.9 million in Q4 2025 per TTI's latest filing, up from $66.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $90.9 million in Q4 2025 to a low of $955000.0 in Q1 2021.
  • Average Construction in Progress over 5 years is $21.5 million, with a median of $10.0 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: plummeted 96.14% in 2021, then surged 768.9% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $5.3 million in 2021, then soared by 43.2% to $7.7 million in 2022, then soared by 34.77% to $10.3 million in 2023, then skyrocketed by 238.18% to $34.9 million in 2024, then soared by 160.42% to $90.9 million in 2025.
  • Per Business Quant, the three most recent readings for TTI's Construction in Progress are $90.9 million (Q4 2025), $66.8 million (Q3 2025), and $53.0 million (Q2 2025).