Transalta Corp (TSLTF) Construction in Progress (2022 - 2025)
Transalta's (TSLTF) quarterly Construction in Progress came in at -$1.4 million in Q4 2025, up 66.61% YoY from -$860801.1 in Q4 2024, and up 34.21% on a QoQ basis from -$2.2 million in Q3 2025.
Transalta Corp (TSLTF) Construction in Progress (2022 - 2025) Analysis & Trends
Transalta (TSLTF) has 3 years of Construction in Progress data on file, last reported at -$1.4 million in Q4 2025.
- Quarterly Construction in Progress rose 66.61% year-over-year to -$1.4 million in Q4 2025, while the trailing twelve-month figure through Dec 2025 was -$1.4 million (up 66.61% YoY) and the FY2025 annual result came in at -$1.4 million, up 67.34% from the prior year.
- Construction in Progress rose to -$1.4 million in Q4 2025, from -$2.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $56.7 million in Q4 2022 to a low of -$4.3 million in Q4 2024.
- A 3-year average of $5.7 million and a median of -$2.9 million in 2025 frame the typical range for Construction in Progress.
- The widest YoY moves for Construction in Progress: up 66.61% in 2025, down 1.29% in 2025.
- Tracing TSLTF's Construction in Progress over 3 years: stood at $56.7 million in 2022, then slumped by 107.57% to -$4.3 million in 2024, then soared by 66.61% to -$1.4 million in 2025.
- The last three Construction in Progress figures came in at -$1.4 million (Q4 2025), -$2.2 million (Q3 2025), and -$2.9 million (Q2 2025), per Business Quant data.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2025 | -1.43 Mn |
| Sep 30, 2025 | -2.18 Mn |
| Jun 30, 2025 | -2.89 Mn |
| Dec 31, 2024 | -4.30 Mn |
| Sep 30, 2024 | -2.93 Mn |
| Jun 30, 2024 | -2.92 Mn |
| Dec 31, 2022 | 56.73 Mn |