KPIs & Operating Metrics(New)
Growth Metrics

Teradyne (TER) Construction in Progress: 2009-2024

Historic Construction in Progress for Teradyne (TER) over the last 16 years, with FY2024 value amounting to $5.7 million.

  • Teradyne's Construction in Progress fell 8963.85% to $5.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $5.7 million, marking a year-over-year decrease of 8963.85%. This contributed to the annual value of $5.7 million for FY2024, which is 8963.85% down from last year.
  • Per Teradyne's latest filing, its Construction in Progress stood at $5.7 million for FY2024, which was down 8963.85% from $54.8 million recorded in FY2023.
  • In the past 5 years, Teradyne's Construction in Progress registered a high of $54.8 million during FY2023, and its lowest value of $5.7 million during FY2024.
  • Moreover, its 5-year median value for Construction in Progress was $13.1 million (2020), whereas its average is $20.8 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 41627.91% in 2020, then crashed by 8963.85% in 2024.
  • Teradyne's Construction in Progress (Annual) stood at $13.1 million in 2020, then tumbled by 38.12% to $8.1 million in 2021, then soared by 177.24% to $22.5 million in 2022, then soared by 143.88% to $54.8 million in 2023, then tumbled by 89.64% to $5.7 million in 2024.
  • Its last three reported values are $5.7 million in FY2024, $54.8 million for FY2023, and $22.5 million during FY2022.