KPIs & Operating Metrics(New)
Growth Metrics

Teradyne (TER) Construction in Progress (2016 - 2025)

Teradyne's Construction in Progress history spans 17 years, with the latest figure at $18.5 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 226.29% year-over-year to $18.5 million; the TTM value through Dec 2025 reached $18.5 million, up 226.29%, while the annual FY2025 figure was $18.5 million, 226.29% up from the prior year.
  • Construction in Progress reached $18.5 million in Q4 2025 per TER's latest filing, up from $5.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $54.8 million in Q4 2023 to a low of $5.7 million in Q4 2024.
  • Average Construction in Progress over 5 years is $21.9 million, with a median of $18.5 million recorded in 2025.
  • Peak YoY movement for Construction in Progress: tumbled 89.64% in 2024, then soared 226.29% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $8.1 million in 2021, then surged by 177.24% to $22.5 million in 2022, then surged by 143.88% to $54.8 million in 2023, then crashed by 89.64% to $5.7 million in 2024, then skyrocketed by 226.29% to $18.5 million in 2025.
  • Per Business Quant, the three most recent readings for TER's Construction in Progress are $18.5 million (Q4 2025), $5.7 million (Q4 2024), and $54.8 million (Q4 2023).