KPIs & Operating Metrics(New)
Growth Metrics

Teradyne (TER) Construction in Progress (2016 - 2025)

Teradyne filings provide 17 years of Construction in Progress readings, the most recent being $18.5 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 226.29% to $18.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $18.5 million, a 226.29% increase, with the full-year FY2025 number at $18.5 million, up 226.29% from a year prior.
  • Construction in Progress hit $18.5 million in Q4 2025 for Teradyne, up from $5.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $54.8 million in Q4 2023 to a low of $5.7 million in Q4 2024.
  • Median Construction in Progress over the past 5 years was $18.5 million (2025), compared with a mean of $21.9 million.
  • Biggest five-year swings in Construction in Progress: crashed 89.64% in 2024 and later skyrocketed 226.29% in 2025.
  • Teradyne's Construction in Progress stood at $8.1 million in 2021, then surged by 177.24% to $22.5 million in 2022, then surged by 143.88% to $54.8 million in 2023, then crashed by 89.64% to $5.7 million in 2024, then skyrocketed by 226.29% to $18.5 million in 2025.
  • The last three reported values for Construction in Progress were $18.5 million (Q4 2025), $5.7 million (Q4 2024), and $54.8 million (Q4 2023) per Business Quant data.