Teradyne (TER) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Teradyne (TER) over the last 16 years, with Q4 2024 value amounting to $5.7 million.
- Teradyne's Construction in Progress fell 8963.85% to $5.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $5.7 million, marking a year-over-year decrease of 8963.85%. This contributed to the annual value of $5.7 million for FY2024, which is 8963.85% down from last year.
- Latest data reveals that Teradyne reported Construction in Progress of $5.7 million as of Q4 2024, which was down 8963.85% from $54.8 million recorded in Q4 2023.
- In the past 5 years, Teradyne's Construction in Progress ranged from a high of $54.8 million in Q4 2023 and a low of $5.7 million during Q4 2024
- For the 5-year period, Teradyne's Construction in Progress averaged around $20.8 million, with its median value being $13.1 million (2020).
- As far as peak fluctuations go, Teradyne's Construction in Progress surged by 41627.91% in 2020, and later tumbled by 8963.85% in 2024.
- Teradyne's Construction in Progress (Quarter) stood at $13.1 million in 2020, then plummeted by 38.12% to $8.1 million in 2021, then surged by 177.24% to $22.5 million in 2022, then surged by 143.88% to $54.8 million in 2023, then plummeted by 89.64% to $5.7 million in 2024.
- Its Construction in Progress stands at $5.7 million for Q4 2024, versus $54.8 million for Q4 2023 and $22.5 million for Q4 2022.