T1 Energy (TE) Construction in Progress (2024 - 2025)
T1 Energy's Construction in Progress history spans 2 years, with the latest figure at $31.1 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 89.32% year-over-year to $31.1 million; the TTM value through Dec 2025 reached $31.1 million, down 89.32%, while the annual FY2025 figure was $31.1 million, 89.32% down from the prior year.
- Construction in Progress reached $31.1 million in Q4 2025 per TE's latest filing, up from $6.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $290.7 million in Q4 2024 to a low of $383000.0 in Q2 2025.