TransDigm (TDG) Construction in Progress (2016 - 2025)
Historic Construction in Progress for TransDigm (TDG) over the last 16 years, with Q3 2025 value amounting to $163.0 million.
- TransDigm's Construction in Progress rose 1560.28% to $163.0 million in Q3 2025 from the same period last year, while for Sep 2025 it was $163.0 million, marking a year-over-year increase of 1560.28%. This contributed to the annual value of $163.0 million for FY2025, which is 1560.28% up from last year.
- Per TransDigm's latest filing, its Construction in Progress stood at $163.0 million for Q3 2025, which was up 1560.28% from $141.0 million recorded in Q3 2024.
- Over the past 5 years, TransDigm's Construction in Progress peaked at $163.0 million during Q3 2025, and registered a low of $61.0 million during Q3 2021.
- Over the past 5 years, TransDigm's median Construction in Progress value was $105.0 million (recorded in 2023), while the average stood at $109.6 million.
- In the last 5 years, TransDigm's Construction in Progress soared by 701.75% in 2021 and then skyrocketed by 3461.54% in 2023.
- Over the past 5 years, TransDigm's Construction in Progress (Quarter) stood at $61.0 million in 2021, then increased by 27.87% to $78.0 million in 2022, then surged by 34.62% to $105.0 million in 2023, then soared by 34.29% to $141.0 million in 2024, then rose by 15.6% to $163.0 million in 2025.
- Its Construction in Progress was $163.0 million in Q3 2025, compared to $141.0 million in Q3 2024 and $105.0 million in Q3 2023.