Stratus Properties (STRS) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Stratus Properties (STRS) over the last 16 years, with Q3 2025 value amounting to $182.8 million.
- Stratus Properties' Construction in Progress fell 3002.81% to $182.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $182.8 million, marking a year-over-year decrease of 3002.81%. This contributed to the annual value of $274.1 million for FY2024, which is 516.53% up from last year.
- Per Stratus Properties' latest filing, its Construction in Progress stood at $182.8 million for Q3 2025, which was down 3002.81% from $175.9 million recorded in Q2 2025.
- Stratus Properties' Construction in Progress' 5-year high stood at $274.6 million during Q1 2025, with a 5-year trough of $110.5 million in Q1 2021.
- Its 5-year average for Construction in Progress is $218.7 million, with a median of $239.3 million in 2022.
- In the last 5 years, Stratus Properties' Construction in Progress surged by 8683.57% in 2022 and then plummeted by 3103.17% in 2025.
- Quarter analysis of 5 years shows Stratus Properties' Construction in Progress stood at $181.2 million in 2021, then surged by 32.03% to $239.3 million in 2022, then rose by 8.93% to $260.6 million in 2023, then increased by 5.17% to $274.1 million in 2024, then plummeted by 33.32% to $182.8 million in 2025.
- Its Construction in Progress was $182.8 million in Q3 2025, compared to $175.9 million in Q2 2025 and $274.6 million in Q1 2025.