Simpson Manufacturing (SSD) Construction in Progress (2016 - 2025)

Simpson Manufacturing (SSD) has disclosed Construction in Progress for 16 consecutive years, with $88.2 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 45.6% to $88.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $88.2 million through Dec 2025, down 45.6% year-over-year, with the annual reading at $88.2 million for FY2025, 45.6% down from the prior year.
  • Construction in Progress hit $88.2 million in Q4 2025 for Simpson Manufacturing, down from $229.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $229.2 million in Q3 2025 to a low of $16.8 million in Q1 2021.
  • Historically, Construction in Progress has averaged $80.5 million across 5 years, with a median of $49.9 million in 2023.
  • Biggest five-year swings in Construction in Progress: surged 165.04% in 2024 and later crashed 45.6% in 2025.
  • Year by year, Construction in Progress stood at $26.5 million in 2021, then increased by 19.08% to $31.5 million in 2022, then surged by 94.07% to $61.2 million in 2023, then soared by 165.04% to $162.1 million in 2024, then plummeted by 45.6% to $88.2 million in 2025.
  • Business Quant data shows Construction in Progress for SSD at $88.2 million in Q4 2025, $229.2 million in Q3 2025, and $214.7 million in Q2 2025.