Solid Power (SLDP) Construction in Progress (2020 - 2025)
Solid Power (SLDP) has disclosed Construction in Progress for 6 consecutive years, with $6.9 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 33.4% to $6.9 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $6.9 million through Dec 2025, up 33.4% year-over-year, with the annual reading at $6.9 million for FY2025, 33.4% up from the prior year.
- Construction in Progress for Q4 2025 was $6.9 million at Solid Power, up from $6.4 million in the prior quarter.
- The five-year high for Construction in Progress was $46.4 million in Q3 2022, with the low at $1.1 million in Q2 2023.
- Average Construction in Progress over 5 years is $11.9 million, with a median of $6.4 million recorded in 2025.
- The sharpest move saw Construction in Progress surged 6093.69% in 2021, then plummeted 96.8% in 2023.
- Over 5 years, Construction in Progress stood at $6.9 million in 2021, then crashed by 67.91% to $2.2 million in 2022, then grew by 4.17% to $2.3 million in 2023, then surged by 123.72% to $5.1 million in 2024, then skyrocketed by 33.4% to $6.9 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $6.9 million, $6.4 million, and $5.5 million for Q4 2025, Q3 2025, and Q2 2025 respectively.