Seaport Entertainment (SEG) Construction in Progress (2023 - 2025)
Seaport Entertainment (SEG) has disclosed Construction in Progress for 3 consecutive years, with $148.1 million as the latest value for Q2 2025.
- On a quarterly basis, Construction in Progress rose 48.32% to $148.1 million in Q2 2025 year-over-year; TTM through Jun 2025 was $148.1 million, a 48.32% increase, with the full-year FY2024 number at $146.5 million, up 42.37% from a year prior.
- Construction in Progress was $148.1 million for Q2 2025 at Seaport Entertainment, up from $145.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $148.1 million in Q2 2025 to a low of $99.8 million in Q2 2024.
- A 3-year average of $130.8 million and a median of $143.7 million in 2024 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: soared 42.37% in 2024, then surged 48.32% in 2025.
- Seaport Entertainment's Construction in Progress stood at $102.9 million in 2023, then skyrocketed by 42.37% to $146.5 million in 2024, then grew by 1.12% to $148.1 million in 2025.
- Per Business Quant, the three most recent readings for SEG's Construction in Progress are $148.1 million (Q2 2025), $145.2 million (Q1 2025), and $146.5 million (Q4 2024).