Growth Metrics

Sandridge Energy (SD) Other Gross PP&E Adjustments (2016 - 2025)

Historic Other Gross PP&E Adjustments for Sandridge Energy (SD) over the last 17 years, with Q3 2025 value amounting to -$1.6 billion.

  • Sandridge Energy's Other Gross PP&E Adjustments fell 462.49% to -$1.6 billion in Q3 2025 from the same period last year, while for Sep 2025 it was -$1.6 billion, marking a year-over-year decrease of 462.49%. This contributed to the annual value of -$1.6 billion for FY2024, which is 1148.66% down from last year.
  • Latest data reveals that Sandridge Energy reported Other Gross PP&E Adjustments of -$1.6 billion as of Q3 2025, which was down 462.49% from -$1.6 billion recorded in Q2 2025.
  • Over the past 5 years, Sandridge Energy's Other Gross PP&E Adjustments peaked at -$1.3 billion during Q2 2021, and registered a low of -$1.6 billion during Q3 2025.
  • For the 5-year period, Sandridge Energy's Other Gross PP&E Adjustments averaged around -$1.4 billion, with its median value being -$1.4 billion (2023).
  • Its Other Gross PP&E Adjustments has fluctuated over the past 5 years, first skyrocketed by 414.87% in 2021, then crashed by 1307.74% in 2025.
  • Quarter analysis of 5 years shows Sandridge Energy's Other Gross PP&E Adjustments stood at -$1.3 billion in 2021, then dropped by 3.95% to -$1.4 billion in 2022, then decreased by 2.21% to -$1.4 billion in 2023, then dropped by 11.49% to -$1.6 billion in 2024, then decreased by 3.44% to -$1.6 billion in 2025.
  • Its Other Gross PP&E Adjustments was -$1.6 billion in Q3 2025, compared to -$1.6 billion in Q2 2025 and -$1.6 billion in Q1 2025.