Growth Metrics

Sandridge Energy (SD) Leases (2019 - 2026)

Sandridge Energy's Leases history spans 7 years, with the latest figure at $1.3 million for Q4 2025.

  • On a quarterly basis, Leases rose 4.59% to $1.3 million in Q4 2025 year-over-year; TTM through Dec 2025 was $1.3 million, a 4.59% increase, with the full-year FY2025 number at $1.3 million, up 4.59% from a year prior.
  • Leases hit $1.3 million in Q4 2025 for Sandridge Energy, up from $907000.0 in the prior quarter.
  • Over the last five years, Leases for SD hit a ceiling of $1.5 million in Q3 2022 and a floor of $319000.0 in Q2 2021.
  • Historically, Leases has averaged $1.2 million across 5 years, with a median of $1.3 million in 2023.
  • Biggest five-year swings in Leases: surged 285.58% in 2022 and later plummeted 33.89% in 2024.
  • Tracing SD's Leases over 5 years: stood at $1.4 million in 2021, then rose by 6.07% to $1.5 million in 2022, then dropped by 4.7% to $1.4 million in 2023, then dropped by 8.08% to $1.3 million in 2024, then grew by 4.59% to $1.3 million in 2025.
  • Business Quant data shows Leases for SD at $1.3 million in Q4 2025, $907000.0 in Q3 2025, and $1.1 million in Q2 2025.