Growth Metrics

EchoStar (SATS) Construction in Progress (2016 - 2019)

Historic Construction in Progress for EchoStar (SATS) over the last 9 years, with Q3 2019 value amounting to $388.2 million.

  • EchoStar's Construction in Progress rose 2912.0% to $388.2 million in Q3 2019 from the same period last year, while for Sep 2019 it was $388.2 million, marking a year-over-year increase of 2912.0%. This contributed to the annual value of $307.0 million for FY2018, which is 1798.71% up from last year.
  • EchoStar's Construction in Progress amounted to $388.2 million in Q3 2019, which was up 2912.0% from $368.3 million recorded in Q2 2019.
  • EchoStar's Construction in Progress' 5-year high stood at $1.4 billion during Q4 2016, with a 5-year trough of $260.2 million in Q4 2017.
  • For the 5-year period, EchoStar's Construction in Progress averaged around $740.1 million, with its median value being $757.7 million (2015).
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 16824.15% in 2015, then crashed by 8165.87% in 2017.
  • Over the past 5 years, EchoStar's Construction in Progress (Quarter) stood at $1.1 billion in 2015, then increased by 27.56% to $1.4 billion in 2016, then tumbled by 81.66% to $260.2 million in 2017, then grew by 17.99% to $307.0 million in 2018, then rose by 26.44% to $388.2 million in 2019.
  • Its last three reported values are $388.2 million in Q3 2019, $368.3 million for Q2 2019, and $332.3 million during Q1 2019.