Cash Flow Statement
Growth Metrics

EchoStar (SATS) Construction in Progress (2016 - 2019)

EchoStar's Construction in Progress history spans 9 years, with the latest figure at $388.2 million for Q3 2019.

  • On a quarterly basis, Construction in Progress rose 29.12% to $388.2 million in Q3 2019 year-over-year; TTM through Sep 2019 was $388.2 million, a 29.12% increase, with the full-year FY2018 number at $307.0 million, up 17.99% from a year prior.
  • Construction in Progress hit $388.2 million in Q3 2019 for EchoStar, up from $368.3 million in the prior quarter.
  • Over the last five years, Construction in Progress for SATS hit a ceiling of $1.4 billion in Q4 2016 and a floor of $260.2 million in Q4 2017.
  • Historically, Construction in Progress has averaged $740.1 million across 5 years, with a median of $757.7 million in 2015.
  • Biggest five-year swings in Construction in Progress: surged 168.24% in 2015 and later plummeted 81.66% in 2017.
  • Tracing SATS's Construction in Progress over 5 years: stood at $1.1 billion in 2015, then increased by 27.56% to $1.4 billion in 2016, then plummeted by 81.66% to $260.2 million in 2017, then rose by 17.99% to $307.0 million in 2018, then rose by 26.44% to $388.2 million in 2019.
  • Business Quant data shows Construction in Progress for SATS at $388.2 million in Q3 2019, $368.3 million in Q2 2019, and $332.3 million in Q1 2019.