Gibraltar Industries (ROCK) Construction in Progress (2016 - 2025)
Gibraltar Industries' Construction in Progress history spans 16 years, with the latest figure at $20.1 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 43.56% year-over-year to $20.1 million; the TTM value through Dec 2025 reached $20.1 million, up 43.56%, while the annual FY2025 figure was $20.1 million, 43.56% up from the prior year.
- Construction in Progress reached $20.1 million in Q4 2025 per ROCK's latest filing, up from $14.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $20.3 million in Q4 2021 to a low of $13.1 million in Q4 2022.
- Average Construction in Progress over 5 years is $17.0 million, with a median of $17.4 million recorded in 2023.
- Peak YoY movement for Construction in Progress: soared 94.04% in 2021, then plummeted 35.62% in 2022.
- A 5-year view of Construction in Progress shows it stood at $20.3 million in 2021, then tumbled by 35.62% to $13.1 million in 2022, then soared by 33.11% to $17.4 million in 2023, then fell by 19.49% to $14.0 million in 2024, then surged by 43.56% to $20.1 million in 2025.
- Per Business Quant, the three most recent readings for ROCK's Construction in Progress are $20.1 million (Q4 2025), $14.0 million (Q4 2024), and $17.4 million (Q4 2023).