Growth Metrics

Gibraltar Industries (ROCK) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Gibraltar Industries (ROCK) over the last 15 years, with Q4 2024 value amounting to $16.4 million.

  • Gibraltar Industries' Construction in Progress fell 582.49% to $16.4 million in Q4 2024 from the same period last year, while for Dec 2024 it was $16.4 million, marking a year-over-year decrease of 582.49%. This contributed to the annual value of $16.4 million for FY2024, which is 582.49% down from last year.
  • According to the latest figures from Q4 2024, Gibraltar Industries' Construction in Progress is $16.4 million, which was down 582.49% from $17.4 million recorded in Q4 2023.
  • Gibraltar Industries' 5-year Construction in Progress high stood at $20.3 million for Q4 2021, and its period low was $10.5 million during Q4 2020.
  • Moreover, its 5-year median value for Construction in Progress was $16.4 million (2024), whereas its average is $15.5 million.
  • Per our database at Business Quant, Gibraltar Industries' Construction in Progress skyrocketed by 10381.99% in 2020 and then plummeted by 3561.82% in 2022.
  • Over the past 5 years, Gibraltar Industries' Construction in Progress (Quarter) stood at $10.5 million in 2020, then soared by 94.04% to $20.3 million in 2021, then crashed by 35.62% to $13.1 million in 2022, then surged by 33.11% to $17.4 million in 2023, then fell by 5.82% to $16.4 million in 2024.
  • Its last three reported values are $16.4 million in Q4 2024, $17.4 million for Q4 2023, and $13.1 million during Q4 2022.