Growth Metrics

ATRenew (RERE) Construction in Progress: 2020-2024

Historic Construction in Progress for ATRenew (RERE) over the last 5 years, with FY2024 value amounting to $235615.5.

  • ATRenew's Construction in Progress fell 9383.4% to $235692.2 in Q4 2024 from the same period last year, while for Dec 2024 it was $235692.2, marking a year-over-year decrease of 9383.4%. This contributed to the annual value of $235615.5 for FY2024, which is 9394.99% down from last year.
  • Latest data reveals that ATRenew reported Construction in Progress of $235615.5 as of FY2024, which was down 9394.99% from $3.9 million recorded in FY2023.
  • In the past 5 years, ATRenew's Construction in Progress registered a high of $3.9 million during FY2023, and its lowest value of $19719.0 during FY2020.
  • In the last 5 years, ATRenew's Construction in Progress had a median value of $961519.6 in 2021 and averaged $1.2 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 477610.38% in 2021, then crashed by 9394.99% in 2024.
  • Annual analysis of 5 years shows ATRenew's Construction in Progress stood at $19719.0 in 2020, then skyrocketed by 4776.1% to $961519.6 in 2021, then increased by 18.34% to $1.1 million in 2022, then skyrocketed by 242.25% to $3.9 million in 2023, then tumbled by 93.95% to $235615.5 in 2024.
  • Its last three reported values are $235615.5 in FY2024, $3.9 million for FY2023, and $1.1 million during FY2022.