Growth Metrics

ATRenew (RERE) Construction in Progress: 2020-2024

Historic Construction in Progress for ATRenew (RERE) over the last 5 years, with Q4 2024 value amounting to $235692.2.

  • ATRenew's Construction in Progress fell 9383.4% to $235692.2 in Q4 2024 from the same period last year, while for Dec 2024 it was $235692.2, marking a year-over-year decrease of 9383.4%. This contributed to the annual value of $235615.5 for FY2024, which is 9394.99% down from last year.
  • Latest data reveals that ATRenew reported Construction in Progress of $235692.2 as of Q4 2024, which was down 9383.4% from $3.8 million recorded in Q4 2023.
  • In the past 5 years, ATRenew's Construction in Progress registered a high of $3.8 million during Q4 2023, and its lowest value of $20521.5 during Q4 2020.
  • Its 5-year average for Construction in Progress is $1.2 million, with a median of $970052.3 in 2021.
  • Per our database at Business Quant, ATRenew's Construction in Progress surged by 462700.73% in 2021 and then tumbled by 9383.4% in 2024.
  • Over the past 5 years, ATRenew's Construction in Progress (Quarter) stood at $20521.5 in 2020, then skyrocketed by 4627.01% to $970052.3 in 2021, then increased by 10.74% to $1.1 million in 2022, then skyrocketed by 255.84% to $3.8 million in 2023, then crashed by 93.83% to $235692.2 in 2024.
  • Its last three reported values are $235692.2 in Q4 2024, $3.8 million for Q4 2023, and $1.1 million during Q4 2022.