Growth Metrics

ATRenew (RERE) Construction in Progress (2020 - 2025)

ATRenew recorded quarterly Construction in Progress of $339792.2 in Q4 2025, up 44.17% quarter-over-quarter from $235692.2 in Q4 2024, and up 44.17% year-over-year from $235692.2 in Q4 2024.

ATRenew's Construction in Progress history runs 6 years deep, the most recent figure standing at $339792.2 for Q4 2025.

  • In Q4 2025, Construction in Progress rose 44.17% year-over-year to $339792.2; the TTM figure through Dec 2025 stood at $339792.2 (up 44.17% YoY), while the FY2025 annual figure was $335358.4, up 42.33% from the prior year.
  • Construction in Progress came in at $339792.2 for Q4 2025 at ATRenew, up from $235692.2 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.8 million in Q4 2023 to a low of $235692.2 in Q4 2024.
  • A 5-year average of $1.3 million and a median of $970052.3 in 2021 frame the typical range for Construction in Progress.
  • Across the five-year window, Construction in Progress surged 4627.01% in 2021 and plunged 93.83% in 2024, its largest moves.
  • ATRenew's Construction in Progress stood at $970052.3 in 2021, then rose by 10.74% to $1.1 million in 2022, then jumped by 255.84% to $3.8 million in 2023, then slumped by 93.83% to $235692.2 in 2024, then jumped by 44.17% to $339792.2 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods registered $339792.2, $235692.2, and $3.8 million for Q4 2025, Q4 2024, and Q4 2023 respectively.

Historic Data

Download Data 🔒
DateValue
Dec 31, 2025 339,792.17
Dec 31, 2024 235,692.21
Dec 31, 2023 3.82 Mn
Dec 31, 2022 1.07 Mn
Dec 31, 2021 970,052.29
Dec 31, 2020 20,521.49