ATRenew Inc. (RERE) Construction in Progress (2020 - 2025)
ATRenew (RERE) posted Construction in Progress of $339792.2 for Q4 2025, up 44.17% sequentially from $235692.2 in Q4 2024, and up 44.17% YoY from $235692.2 in Q4 2024.
ATRenew Inc. (RERE) Construction in Progress (2020 - 2025) Analysis & Trends
ATRenew (RERE) has 6 years of Construction in Progress data on file, last reported at $339792.2 in Q4 2025.
- Quarterly Construction in Progress rose 44.17% year-over-year to $339792.2 in Q4 2025, while the trailing twelve-month figure through Dec 2025 was $339792.2 (up 44.17% YoY) and the FY2025 annual result came in at $335358.4, up 42.33% from the prior year.
- Construction in Progress improved to $339792.2 in Q4 2025 per RERE's latest filing, from $235692.2 in the prior quarter.
- The five-year high for Construction in Progress was $3.8 million in Q4 2023, with the low at $235692.2 in Q4 2024.
- Average Construction in Progress over 5 years is $1.3 million, with a median of $970052.3 recorded in 2021.
- Year-over-year, Construction in Progress surged 4627.01% in 2021 and tumbled 93.83% in 2024.
- ATRenew's Construction in Progress stood at $970052.3 in 2021, then advanced by 10.74% to $1.1 million in 2022, then soared by 255.84% to $3.8 million in 2023, then plunged by 93.83% to $235692.2 in 2024, then soared by 44.17% to $339792.2 in 2025.
- Business Quant data shows RERE's Construction in Progress at $339792.2 in Q4 2025, $235692.2 in Q4 2024, and $3.8 million in Q4 2023.
Peer Comparison
Historic Data
Download Data| Date | Value |
|---|---|
| Dec 31, 2025 | 339,792.17 |
| Dec 31, 2024 | 235,692.21 |
| Dec 31, 2023 | 3.82 Mn |
| Dec 31, 2022 | 1.07 Mn |
| Dec 31, 2021 | 970,052.29 |
| Dec 31, 2020 | 20,521.49 |