Growth Metrics

ATRenew (RERE) Construction in Progress (2020 - 2024)

Historic Construction in Progress for ATRenew (RERE) over the last 5 years, with Q4 2024 value amounting to $235692.2.

  • ATRenew's Construction in Progress fell 9383.4% to $235692.2 in Q4 2024 from the same period last year, while for Dec 2024 it was $235692.2, marking a year-over-year decrease of 9383.4%. This contributed to the annual value of $235615.5 for FY2024, which is 9394.99% down from last year.
  • As of Q4 2024, ATRenew's Construction in Progress stood at $235692.2, which was down 9383.4% from $3.8 million recorded in Q4 2023.
  • In the past 5 years, ATRenew's Construction in Progress ranged from a high of $3.8 million in Q4 2023 and a low of $20521.5 during Q4 2020
  • For the 5-year period, ATRenew's Construction in Progress averaged around $1.2 million, with its median value being $970052.3 (2021).
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 462700.73% in 2021, then tumbled by 9383.4% in 2024.
  • ATRenew's Construction in Progress (Quarter) stood at $20521.5 in 2020, then skyrocketed by 4627.01% to $970052.3 in 2021, then increased by 10.74% to $1.1 million in 2022, then skyrocketed by 255.84% to $3.8 million in 2023, then crashed by 93.83% to $235692.2 in 2024.
  • Its Construction in Progress stands at $235692.2 for Q4 2024, versus $3.8 million for Q4 2023 and $1.1 million for Q4 2022.