ATRenew Inc. (RERE) Construction in Progress (2020 - 2025)

ATRenew (RERE) posted Construction in Progress of $339792.2 for Q4 2025, up 44.17% sequentially from $235692.2 in Q4 2024, and up 44.17% YoY from $235692.2 in Q4 2024.

ATRenew Inc. (RERE) Construction in Progress (2020 - 2025) Analysis & Trends

ATRenew (RERE) has 6 years of Construction in Progress data on file, last reported at $339792.2 in Q4 2025.

  • Quarterly Construction in Progress rose 44.17% year-over-year to $339792.2 in Q4 2025, while the trailing twelve-month figure through Dec 2025 was $339792.2 (up 44.17% YoY) and the FY2025 annual result came in at $335358.4, up 42.33% from the prior year.
  • Construction in Progress improved to $339792.2 in Q4 2025 per RERE's latest filing, from $235692.2 in the prior quarter.
  • The five-year high for Construction in Progress was $3.8 million in Q4 2023, with the low at $235692.2 in Q4 2024.
  • Average Construction in Progress over 5 years is $1.3 million, with a median of $970052.3 recorded in 2021.
  • Year-over-year, Construction in Progress surged 4627.01% in 2021 and tumbled 93.83% in 2024.
  • ATRenew's Construction in Progress stood at $970052.3 in 2021, then advanced by 10.74% to $1.1 million in 2022, then soared by 255.84% to $3.8 million in 2023, then plunged by 93.83% to $235692.2 in 2024, then soared by 44.17% to $339792.2 in 2025.
  • Business Quant data shows RERE's Construction in Progress at $339792.2 in Q4 2025, $235692.2 in Q4 2024, and $3.8 million in Q4 2023.

Peer Comparison

Historic Data

Download Data
DateValue
Dec 31, 2025 339,792.17
Dec 31, 2024 235,692.21
Dec 31, 2023 3.82 Mn
Dec 31, 2022 1.07 Mn
Dec 31, 2021 970,052.29
Dec 31, 2020 20,521.49