ATRenew (RERE) Construction in Progress (2020 - 2025)

ATRenew (RERE) has disclosed Construction in Progress for 6 consecutive years, with $339792.2 as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 44.17% to $339792.2 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $339792.2 through Dec 2025, up 44.17% year-over-year, with the annual reading at $335358.4 for FY2025, 42.33% up from the prior year.
  • Construction in Progress hit $339792.2 in Q4 2025 for ATRenew, up from $235692.2 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $3.8 million in Q4 2023 to a low of $235692.2 in Q4 2024.
  • Historically, Construction in Progress has averaged $1.3 million across 5 years, with a median of $970052.3 in 2021.
  • Biggest five-year swings in Construction in Progress: skyrocketed 4627.01% in 2021 and later plummeted 93.83% in 2024.
  • Year by year, Construction in Progress stood at $970052.3 in 2021, then increased by 10.74% to $1.1 million in 2022, then surged by 255.84% to $3.8 million in 2023, then tumbled by 93.83% to $235692.2 in 2024, then skyrocketed by 44.17% to $339792.2 in 2025.
  • Business Quant data shows Construction in Progress for RERE at $339792.2 in Q4 2025, $235692.2 in Q4 2024, and $3.8 million in Q4 2023.