Reading International (RDI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Reading International (RDI) over the last 14 years, with Q3 2025 value amounting to $2.1 million.
- Reading International's Construction in Progress rose 669.37% to $2.1 million in Q3 2025 from the same period last year, while for Sep 2025 it was $2.1 million, marking a year-over-year increase of 669.37%. This contributed to the annual value of $2.0 million for FY2024, which is 7845.6% down from last year.
- According to the latest figures from Q3 2025, Reading International's Construction in Progress is $2.1 million, which was up 669.37% from $2.1 million recorded in Q2 2025.
- Over the past 5 years, Reading International's Construction in Progress peaked at $11.9 million during Q1 2023, and registered a low of $2.0 million during Q3 2024.
- Over the past 5 years, Reading International's median Construction in Progress value was $9.0 million (recorded in 2024), while the average stood at $7.0 million.
- As far as peak fluctuations go, Reading International's Construction in Progress skyrocketed by 17888.84% in 2023, and later crashed by 7929.44% in 2024.
- Reading International's Construction in Progress (Quarter) stood at $5.4 million in 2021, then skyrocketed by 118.24% to $11.8 million in 2022, then fell by 21.67% to $9.2 million in 2023, then tumbled by 78.46% to $2.0 million in 2024, then rose by 5.89% to $2.1 million in 2025.
- Its last three reported values are $2.1 million in Q3 2025, $2.1 million for Q2 2025, and $2.1 million during Q1 2025.