Marcus (MCS) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Marcus (MCS) over the last 15 years, with Q3 2025 value amounting to $12.0 million.
- Marcus' Construction in Progress fell 3137.14% to $12.0 million in Q3 2025 from the same period last year, while for Sep 2025 it was $12.0 million, marking a year-over-year decrease of 3137.14%. This contributed to the annual value of $15.6 million for FY2024, which is 3637.16% up from last year.
- Latest data reveals that Marcus reported Construction in Progress of $12.0 million as of Q3 2025, which was down 3137.14% from $40.4 million recorded in Q2 2025.
- Marcus' 5-year Construction in Progress high stood at $40.4 million for Q2 2025, and its period low was $2.8 million during Q3 2021.
- Its 5-year average for Construction in Progress is $12.5 million, with a median of $9.6 million in 2023.
- In the last 5 years, Marcus' Construction in Progress crashed by 6736.96% in 2021 and then soared by 40875.65% in 2025.
- Marcus' Construction in Progress (Quarter) stood at $6.0 million in 2021, then surged by 71.75% to $10.3 million in 2022, then increased by 10.94% to $11.4 million in 2023, then skyrocketed by 36.37% to $15.6 million in 2024, then dropped by 22.74% to $12.0 million in 2025.
- Its Construction in Progress was $12.0 million in Q3 2025, compared to $40.4 million in Q2 2025 and $31.5 million in Q1 2025.