Growth Metrics

Marcus (MCS) Construction in Progress (2016 - 2026)

Marcus filings provide 16 years of Construction in Progress readings, the most recent being $12.3 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 60.97% to $12.3 million in Q1 2026 year-over-year; TTM through Mar 2026 was $12.3 million, a 60.97% decrease, with the full-year FY2025 number at $15.4 million, down 1.37% from a year prior.
  • Construction in Progress hit $12.3 million in Q1 2026 for Marcus, down from $15.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $40.4 million in Q2 2025 to a low of $3.7 million in Q2 2022.
  • Median Construction in Progress over the past 5 years was $12.0 million (2025), compared with a mean of $14.5 million.
  • Biggest five-year swings in Construction in Progress: soared 408.76% in 2025 and later plummeted 60.97% in 2026.
  • Marcus' Construction in Progress stood at $10.3 million in 2022, then rose by 10.94% to $11.4 million in 2023, then skyrocketed by 36.37% to $15.6 million in 2024, then fell by 1.37% to $15.4 million in 2025, then dropped by 19.95% to $12.3 million in 2026.
  • The last three reported values for Construction in Progress were $12.3 million (Q1 2026), $15.4 million (Q4 2025), and $12.0 million (Q3 2025) per Business Quant data.