Erayak Power Solution (RAYA) Work In Process (2022 - 2025)

Erayak Power Solution has reported Work In Process over the past 3 years, most recently at $1.5 million for Q4 2024.

  • Quarterly results put Work In Process at $1.5 million for Q4 2024, up 62.54% from a year ago — trailing twelve months through Dec 2024 was $1.5 million (up 62.54% YoY), and the annual figure for FY2024 was $1.5 million, up 62.54%.
  • Work In Process for Q4 2024 was $1.5 million at Erayak Power Solution, up from $916997.0 in the prior quarter.
  • Over the last five years, Work In Process for RAYA hit a ceiling of $1.5 million in Q4 2024 and a floor of $642235.0 in Q4 2022.
  • Median Work In Process over the past 3 years was $916997.0 (2023), compared with a mean of $1.0 million.
  • Biggest five-year swings in Work In Process: surged 42.78% in 2023 and later surged 62.54% in 2024.
  • Erayak Power Solution's Work In Process stood at $642235.0 in 2022, then surged by 42.78% to $916997.0 in 2023, then surged by 62.54% to $1.5 million in 2024.
  • The last three reported values for Work In Process were $1.5 million (Q4 2024), $916997.0 (Q4 2023), and $642235.0 (Q4 2022) per Business Quant data.