Rani Therapeutics Holdings (RANI) Construction in Progress (2020 - 2021)
Rani Therapeutics Holdings' Construction in Progress history spans 2 years, with the latest figure at $3.5 million for Q4 2021.
- On a quarterly basis, Construction in Progress changed 0.0% to $3.5 million in Q4 2021 year-over-year; TTM through Dec 2021 was $3.5 million, a 0.0% change, with the full-year FY2021 number at $3.5 million, changed 0.0% from a year prior.
- Construction in Progress came in at $3.5 million for Q4 2021, roughly flat from $3.5 million in the prior quarter.
- The five-year high for Construction in Progress was $3.5 million in Q4 2020, with the low at $3.5 million in Q4 2020.