Growth Metrics

Qorvo (QRVO) Construction in Progress (2017 - 2025)

Qorvo filings provide 12 years of Construction in Progress readings, the most recent being $98.2 million for Q1 2025.

  • On a quarterly basis, Construction in Progress rose 13.91% to $98.2 million in Q1 2025 year-over-year; TTM through Mar 2025 was $98.2 million, a 13.91% increase, with the full-year FY2025 number at $98.2 million, up 13.91% from a year prior.
  • Construction in Progress hit $98.2 million in Q1 2025 for Qorvo, up from $86.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $130.1 million in Q2 2023 to a low of $86.2 million in Q1 2024.
  • Median Construction in Progress over the past 5 years was $108.6 million (2021), compared with a mean of $110.3 million.
  • Biggest five-year swings in Construction in Progress: rose 18.2% in 2022 and later crashed 33.71% in 2024.
  • Qorvo's Construction in Progress stood at $108.6 million in 2021, then rose by 18.2% to $128.3 million in 2022, then grew by 1.38% to $130.1 million in 2023, then crashed by 33.71% to $86.2 million in 2024, then rose by 13.91% to $98.2 million in 2025.
  • The last three reported values for Construction in Progress were $98.2 million (Q1 2025), $86.2 million (Q1 2024), and $130.1 million (Q2 2023) per Business Quant data.