Qorvo (QRVO) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Qorvo (QRVO) over the last 12 years, with Q1 2025 value amounting to $98.2 million.
- Qorvo's Construction in Progress rose 1390.82% to $98.2 million in Q1 2025 from the same period last year, while for Mar 2025 it was $98.2 million, marking a year-over-year increase of 1390.82%. This contributed to the annual value of $98.2 million for FY2025, which is 1390.82% up from last year.
- As of Q1 2025, Qorvo's Construction in Progress stood at $98.2 million, which was up 1390.82% from $86.2 million recorded in Q1 2024.
- In the past 5 years, Qorvo's Construction in Progress registered a high of $130.1 million during Q2 2023, and its lowest value of $86.2 million during Q1 2024.
- For the 5-year period, Qorvo's Construction in Progress averaged around $110.3 million, with its median value being $108.6 million (2021).
- As far as peak fluctuations go, Qorvo's Construction in Progress soared by 1819.59% in 2022, and later plummeted by 3371.31% in 2024.
- Over the past 5 years, Qorvo's Construction in Progress (Quarter) stood at $108.6 million in 2021, then grew by 18.2% to $128.3 million in 2022, then rose by 1.38% to $130.1 million in 2023, then crashed by 33.71% to $86.2 million in 2024, then grew by 13.91% to $98.2 million in 2025.
- Its last three reported values are $98.2 million in Q1 2025, $86.2 million for Q1 2024, and $130.1 million during Q2 2023.