Growth Metrics

Pra (PRAA) Construction in Progress (2017 - 2025)

Pra's Construction in Progress history spans 9 years, with the latest figure at $2.0 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 136.08% to $2.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $2.0 million, a 136.08% increase, with the full-year FY2025 number at $2.0 million, up 136.08% from a year prior.
  • Construction in Progress hit $2.0 million in Q4 2025 for Pra, up from $848000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for PRAA hit a ceiling of $3.1 million in Q4 2021 and a floor of $848000.0 in Q4 2024.
  • Historically, Construction in Progress has averaged $1.6 million across 5 years, with a median of $989000.0 in 2023.
  • Biggest five-year swings in Construction in Progress: plummeted 70.2% in 2022 and later surged 136.08% in 2025.
  • Tracing PRAA's Construction in Progress over 5 years: stood at $3.1 million in 2021, then plummeted by 70.2% to $932000.0 in 2022, then grew by 6.12% to $989000.0 in 2023, then dropped by 14.26% to $848000.0 in 2024, then surged by 136.08% to $2.0 million in 2025.
  • Business Quant data shows Construction in Progress for PRAA at $2.0 million in Q4 2025, $848000.0 in Q4 2024, and $989000.0 in Q4 2023.