Growth Metrics

Pra Group (PRAA) Construction in Progress: 2017-2024

  • Pra Group's Construction in Progress fell 14.26% to $848,000 in Q4 2024 from the same period last year, while for Dec 2024 it was $848,000, marking a year-over-year decrease of 14.26%. This contributed to the annual value of $848,000 for FY2024, which is 14.26% down from last year.
  • Latest data reveals that Pra Group reported Construction in Progress of $848,000 as of Q4 2024, which was down 14.26% from $989,000 recorded in Q4 2023.
  • Pra Group's 5-year Construction in Progress high stood at $3.5 million for Q4 2020, and its period low was $848,000 during Q4 2024.
  • For the 3-year period, Pra Group's Construction in Progress averaged around $923,000, with its median value being $932,000 (2022).
  • As far as peak fluctuations go, Pra Group's Construction in Progress crashed by 70.20% in 2022, and later grew by 6.12% in 2023.
  • Pra Group's Construction in Progress (Quarterly) stood at $3.5 million in 2020, then decreased by 11.82% to $3.1 million in 2021, then plummeted by 70.20% to $932,000 in 2022, then grew by 6.12% to $989,000 in 2023, then fell by 14.26% to $848,000 in 2024.
  • Its last three reported values are $848,000 in Q4 2024, $989,000 for Q4 2023, and $932,000 during Q4 2022.