Growth Metrics

Upbound (UPBD) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Upbound (UPBD) over the last 15 years, with Q4 2024 value amounting to $16.7 million.

  • Upbound's Construction in Progress fell 5277.35% to $16.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $16.7 million, marking a year-over-year decrease of 5277.35%. This contributed to the annual value of $16.7 million for FY2024, which is 5277.35% down from last year.
  • Per Upbound's latest filing, its Construction in Progress stood at $16.7 million for Q4 2024, which was down 5277.35% from $35.4 million recorded in Q4 2023.
  • Upbound's Construction in Progress' 5-year high stood at $35.4 million during Q4 2023, with a 5-year trough of $7.3 million in Q4 2020.
  • Its 5-year average for Construction in Progress is $22.0 million, with a median of $25.1 million in 2022.
  • Its Construction in Progress has fluctuated over the past 5 years, first soared by 24795.71% in 2021, then crashed by 5277.35% in 2024.
  • Upbound's Construction in Progress (Quarter) stood at $7.3 million in 2020, then surged by 247.96% to $25.3 million in 2021, then fell by 0.67% to $25.1 million in 2022, then surged by 40.78% to $35.4 million in 2023, then crashed by 52.77% to $16.7 million in 2024.
  • Its last three reported values are $16.7 million in Q4 2024, $35.4 million for Q4 2023, and $25.1 million during Q4 2022.