Cash Flow Statement
Growth Metrics

Pentair (PNR) Construction in Progress (2016 - 2026)

Pentair has reported Construction in Progress over the past 17 years, most recently at $51.2 million for Q1 2026.

  • Quarterly Construction in Progress rose 23.97% to $51.2 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $51.2 million through Mar 2026, up 23.97% year-over-year, with the annual reading at $45.1 million for FY2025, 11.74% down from the prior year.
  • Construction in Progress was $51.2 million for Q1 2026 at Pentair, up from $45.1 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $81.5 million in Q3 2022 and troughed at $38.2 million in Q2 2024.
  • The 5-year median for Construction in Progress is $51.1 million (2024), against an average of $52.8 million.
  • Year-over-year, Construction in Progress surged 52.33% in 2022 and then plummeted 34.99% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $60.6 million in 2022, then fell by 7.92% to $55.8 million in 2023, then dropped by 8.42% to $51.1 million in 2024, then fell by 11.74% to $45.1 million in 2025, then grew by 13.53% to $51.2 million in 2026.
  • Per Business Quant, the three most recent readings for PNR's Construction in Progress are $51.2 million (Q1 2026), $45.1 million (Q4 2025), and $43.6 million (Q3 2025).