Growth Metrics

Pentair (PNR) Construction in Progress (2016 - 2025)

Pentair (PNR) has disclosed Construction in Progress for 16 consecutive years, with $45.1 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 11.74% to $45.1 million in Q4 2025 year-over-year; TTM through Dec 2025 was $45.1 million, a 11.74% decrease, with the full-year FY2025 number at $45.1 million, down 11.74% from a year prior.
  • Construction in Progress was $45.1 million for Q4 2025 at Pentair, up from $43.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $81.5 million in Q3 2022 to a low of $38.2 million in Q2 2024.
  • A 5-year average of $53.5 million and a median of $51.8 million in 2021 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: surged 52.33% in 2022, then plummeted 34.99% in 2023.
  • Pentair's Construction in Progress stood at $62.8 million in 2021, then fell by 3.5% to $60.6 million in 2022, then dropped by 7.92% to $55.8 million in 2023, then decreased by 8.42% to $51.1 million in 2024, then dropped by 11.74% to $45.1 million in 2025.
  • Per Business Quant, the three most recent readings for PNR's Construction in Progress are $45.1 million (Q4 2025), $43.6 million (Q3 2025), and $39.8 million (Q2 2025).