Planet Green Holdings (PLAG) Construction in Progress (2016 - 2025)
Planet Green Holdings (PLAG) has disclosed Construction in Progress for 10 consecutive years, with $23909.0 as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 4.38% to $23909.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $23909.0 through Dec 2025, up 4.38% year-over-year, with the annual reading at $23909.0 for FY2025, 4.38% up from the prior year.
- Construction in Progress hit $23909.0 in Q4 2025 for Planet Green Holdings, up from $23486.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $2.5 million in Q4 2021 to a low of $22906.0 in Q4 2024.
- Historically, Construction in Progress has averaged $476630.8 across 5 years, with a median of $31064.5 in 2024.
- Biggest five-year swings in Construction in Progress: surged 166.88% in 2021 and later crashed 98.84% in 2022.
- Year by year, Construction in Progress stood at $2.5 million in 2021, then tumbled by 98.66% to $33260.0 in 2022, then fell by 29.03% to $23606.0 in 2023, then decreased by 2.97% to $22906.0 in 2024, then rose by 4.38% to $23909.0 in 2025.
- Business Quant data shows Construction in Progress for PLAG at $23909.0 in Q4 2025, $23486.0 in Q3 2025, and $23340.0 in Q2 2025.