Planet Green Holdings (PLAG) Construction in Progress (2016 - 2025)
Planet Green Holdings' Construction in Progress history spans 9 years, with the latest figure at $23486.0 for Q3 2025.
- For Q3 2025, Construction in Progress fell 24.81% year-over-year to $23486.0; the TTM value through Sep 2025 reached $23486.0, down 24.81%, while the annual FY2024 figure was $22906.0, 2.97% down from the prior year.
- Construction in Progress for Q3 2025 was $23486.0 at Planet Green Holdings, up from $23340.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $2.5 million in Q4 2021 and bottomed at $22906.0 in Q4 2024.
- The 5-year median for Construction in Progress is $31235.0 (2024), against an average of $500458.2.
- The largest annual shift saw Construction in Progress skyrocketed 166.88% in 2021 before it tumbled 98.84% in 2022.
- A 5-year view of Construction in Progress shows it stood at $2.5 million in 2021, then plummeted by 98.66% to $33260.0 in 2022, then decreased by 29.03% to $23606.0 in 2023, then dropped by 2.97% to $22906.0 in 2024, then rose by 2.53% to $23486.0 in 2025.
- Per Business Quant, the three most recent readings for PLAG's Construction in Progress are $23486.0 (Q3 2025), $23340.0 (Q2 2025), and $23040.0 (Q1 2025).