Growth Metrics

Planet Green Holdings (PLAG) Construction in Progress (2016 - 2025)

Planet Green Holdings' Construction in Progress history spans 11 years, with the latest figure at $23909.0 for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 4.38% to $23909.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $23909.0, a 4.38% increase, with the full-year FY2025 number at $23909.0, up 4.38% from a year prior.
  • Construction in Progress hit $23909.0 in Q4 2025 for Planet Green Holdings, up from $23486.0 in the prior quarter.
  • Over the last five years, Construction in Progress for PLAG hit a ceiling of $2.5 million in Q4 2021 and a floor of $22906.0 in Q4 2024.
  • Historically, Construction in Progress has averaged $476630.8 across 5 years, with a median of $31064.5 in 2024.
  • Biggest five-year swings in Construction in Progress: surged 166.88% in 2021 and later crashed 98.84% in 2022.
  • Tracing PLAG's Construction in Progress over 5 years: stood at $2.5 million in 2021, then plummeted by 98.66% to $33260.0 in 2022, then decreased by 29.03% to $23606.0 in 2023, then dropped by 2.97% to $22906.0 in 2024, then increased by 4.38% to $23909.0 in 2025.
  • Business Quant data shows Construction in Progress for PLAG at $23909.0 in Q4 2025, $23486.0 in Q3 2025, and $23340.0 in Q2 2025.