Growth Metrics

Planet Green Holdings (PLAG) Construction in Progress (2017 - 2025)

Historic Construction in Progress for Planet Green Holdings (PLAG) over the last 15 years, with Q3 2025 value amounting to $23486.0.

  • Planet Green Holdings' Construction in Progress fell 2480.87% to $23486.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $23486.0, marking a year-over-year decrease of 2480.87%. This contributed to the annual value of $22906.0 for FY2024, which is 296.53% down from last year.
  • As of Q3 2025, Planet Green Holdings' Construction in Progress stood at $23486.0, which was down 2480.87% from $23340.0 recorded in Q2 2025.
  • In the past 5 years, Planet Green Holdings' Construction in Progress ranged from a high of $2.5 million in Q4 2021 and a low of $22906.0 during Q4 2024
  • For the 5-year period, Planet Green Holdings' Construction in Progress averaged around $500458.2, with its median value being $31235.0 (2024).
  • In the last 5 years, Planet Green Holdings' Construction in Progress surged by 16688.35% in 2021 and then tumbled by 9884.26% in 2022.
  • Planet Green Holdings' Construction in Progress (Quarter) stood at $2.5 million in 2021, then crashed by 98.66% to $33260.0 in 2022, then fell by 29.03% to $23606.0 in 2023, then dropped by 2.97% to $22906.0 in 2024, then rose by 2.53% to $23486.0 in 2025.
  • Its Construction in Progress stands at $23486.0 for Q3 2025, versus $23340.0 for Q2 2025 and $23040.0 for Q1 2025.