Growth Metrics

Keurig Dr Pepper (KDP) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Keurig Dr Pepper (KDP) over the last 16 years, with Q4 2024 value amounting to $384.0 million.

  • Keurig Dr Pepper's Construction in Progress rose 520.55% to $384.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $384.0 million, marking a year-over-year increase of 520.55%. This contributed to the annual value of $384.0 million for FY2024, which is 520.55% up from last year.
  • Latest data reveals that Keurig Dr Pepper reported Construction in Progress of $384.0 million as of Q4 2024, which was up 520.55% from $365.0 million recorded in Q4 2023.
  • Over the past 5 years, Keurig Dr Pepper's Construction in Progress peaked at $393.0 million during Q4 2020, and registered a low of $138.0 million during Q4 2021.
  • For the 5-year period, Keurig Dr Pepper's Construction in Progress averaged around $306.2 million, with its median value being $365.0 million (2023).
  • Per our database at Business Quant, Keurig Dr Pepper's Construction in Progress crashed by 6488.55% in 2021 and then surged by 8188.41% in 2022.
  • Keurig Dr Pepper's Construction in Progress (Quarter) stood at $393.0 million in 2020, then tumbled by 64.89% to $138.0 million in 2021, then surged by 81.88% to $251.0 million in 2022, then soared by 45.42% to $365.0 million in 2023, then increased by 5.21% to $384.0 million in 2024.
  • Its Construction in Progress stands at $384.0 million for Q4 2024, versus $365.0 million for Q4 2023 and $251.0 million for Q4 2022.