Keurig Dr Pepper (KDP) Construction in Progress (2016 - 2025)
Keurig Dr Pepper (KDP) has disclosed Construction in Progress for 17 consecutive years, with $289.0 million as the latest value for Q4 2025.
- Quarterly Construction in Progress fell 24.74% to $289.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $289.0 million through Dec 2025, down 24.74% year-over-year, with the annual reading at $289.0 million for FY2025, 24.74% down from the prior year.
- Construction in Progress for Q4 2025 was $289.0 million at Keurig Dr Pepper, down from $384.0 million in the prior quarter.
- The five-year high for Construction in Progress was $384.0 million in Q4 2024, with the low at $138.0 million in Q4 2021.
- Average Construction in Progress over 5 years is $285.4 million, with a median of $289.0 million recorded in 2025.
- The sharpest move saw Construction in Progress tumbled 64.89% in 2021, then surged 81.88% in 2022.
- Over 5 years, Construction in Progress stood at $138.0 million in 2021, then soared by 81.88% to $251.0 million in 2022, then surged by 45.42% to $365.0 million in 2023, then increased by 5.21% to $384.0 million in 2024, then fell by 24.74% to $289.0 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $289.0 million, $384.0 million, and $365.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.