Growth Metrics

Keurig Dr Pepper (KDP) Construction in Progress (2016 - 2025)

Keurig Dr Pepper (KDP) has disclosed Construction in Progress for 16 consecutive years, with $289.0 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 24.74% to $289.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $289.0 million, a 24.74% decrease, with the full-year FY2025 number at $289.0 million, down 24.74% from a year prior.
  • Construction in Progress was $289.0 million for Q4 2025 at Keurig Dr Pepper, down from $384.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $384.0 million in Q4 2024 to a low of $138.0 million in Q4 2021.
  • A 5-year average of $285.4 million and a median of $289.0 million in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: plummeted 64.89% in 2021, then skyrocketed 81.88% in 2022.
  • Keurig Dr Pepper's Construction in Progress stood at $138.0 million in 2021, then surged by 81.88% to $251.0 million in 2022, then skyrocketed by 45.42% to $365.0 million in 2023, then grew by 5.21% to $384.0 million in 2024, then decreased by 24.74% to $289.0 million in 2025.
  • Per Business Quant, the three most recent readings for KDP's Construction in Progress are $289.0 million (Q4 2025), $384.0 million (Q4 2024), and $365.0 million (Q4 2023).