Growth Metrics

Keurig Dr Pepper (KDP) Construction in Progress (2016 - 2025)

Keurig Dr Pepper has reported Construction in Progress over the past 17 years, most recently at $289.0 million for Q4 2025.

  • Quarterly Construction in Progress fell 24.74% to $289.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $289.0 million through Dec 2025, down 24.74% year-over-year, with the annual reading at $289.0 million for FY2025, 24.74% down from the prior year.
  • Construction in Progress was $289.0 million for Q4 2025 at Keurig Dr Pepper, down from $384.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $384.0 million in Q4 2024 and troughed at $138.0 million in Q4 2021.
  • The 5-year median for Construction in Progress is $289.0 million (2025), against an average of $285.4 million.
  • Biggest five-year swings in Construction in Progress: crashed 64.89% in 2021 and later soared 81.88% in 2022.
  • Tracing KDP's Construction in Progress over 5 years: stood at $138.0 million in 2021, then soared by 81.88% to $251.0 million in 2022, then surged by 45.42% to $365.0 million in 2023, then increased by 5.21% to $384.0 million in 2024, then fell by 24.74% to $289.0 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $289.0 million, $384.0 million, and $365.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.