Park Aerospace (PKE) Restructuring Costs (2016 - 2022)
Historic Restructuring Costs for Park Aerospace (PKE) over the last 11 years, with Q1 2022 value amounting to $62000.0.
- Park Aerospace's Restructuring Costs fell 9605.1% to $62000.0 in Q1 2022 from the same period last year, while for Nov 2022 it was $62000.0, marking a year-over-year decrease of 9649.12%. This contributed to the annual value of $259000.0 for FY2022, which is 8350.32% down from last year.
- Latest data reveals that Park Aerospace reported Restructuring Costs of $62000.0 as of Q1 2022, which was down 9605.1% from $13000.0 recorded in Q4 2021.
- Park Aerospace's 5-year Restructuring Costs high stood at $1.6 million for Q1 2021, and its period low was -$4.6 million during Q1 2018.
- In the last 4 years, Park Aerospace's Restructuring Costs had a median value of $116000.0 in 2021 and averaged -$289500.0.
- Per our database at Business Quant, Park Aerospace's Restructuring Costs plummeted by 212766.99% in 2018 and then skyrocketed by 10568.75% in 2019.
- Over the past 4 years, Park Aerospace's Restructuring Costs (Quarter) stood at $183000.0 in 2018, then soared by 42.62% to $261000.0 in 2019, then plummeted by 95.02% to $13000.0 in 2021, then skyrocketed by 376.92% to $62000.0 in 2022.
- Its Restructuring Costs was $62000.0 in Q1 2022, compared to $13000.0 in Q4 2021 and $170000.0 in Q3 2021.