Origin Materials (ORGNW) Construction in Progress (2022 - 2025)

Origin Materials (ORGNW) has disclosed Construction in Progress for 4 consecutive years, with $44.1 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 9.27% to $44.1 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $44.1 million through Dec 2025, up 9.27% year-over-year, with the annual reading at $44.1 million for FY2025, 9.27% up from the prior year.
  • Construction in Progress hit $44.1 million in Q4 2025 for Origin Materials, down from $61.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $138.8 million in Q4 2022 to a low of $35.3 million in Q3 2024.
  • Historically, Construction in Progress has averaged $58.7 million across 4 years, with a median of $52.2 million in 2023.
  • Biggest five-year swings in Construction in Progress: tumbled 61.09% in 2023 and later soared 73.37% in 2025.
  • Year by year, Construction in Progress stood at $138.8 million in 2022, then crashed by 61.09% to $54.0 million in 2023, then dropped by 25.34% to $40.3 million in 2024, then increased by 9.27% to $44.1 million in 2025.
  • Business Quant data shows Construction in Progress for ORGNW at $44.1 million in Q4 2025, $61.3 million in Q3 2025, and $63.1 million in Q2 2025.