Origin Materials (ORGN) Construction in Progress (2022 - 2025)
Origin Materials' Construction in Progress history spans 4 years, with the latest figure at $44.1 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 9.27% to $44.1 million in Q4 2025 year-over-year; TTM through Dec 2025 was $44.1 million, a 9.27% increase, with the full-year FY2025 number at $44.1 million, up 9.27% from a year prior.
- Construction in Progress hit $44.1 million in Q4 2025 for Origin Materials, down from $61.3 million in the prior quarter.
- Over the last five years, Construction in Progress for ORGN hit a ceiling of $138.8 million in Q4 2022 and a floor of $35.3 million in Q3 2024.
- Historically, Construction in Progress has averaged $58.7 million across 4 years, with a median of $52.2 million in 2023.
- Biggest five-year swings in Construction in Progress: tumbled 61.09% in 2023 and later soared 73.37% in 2025.
- Tracing ORGN's Construction in Progress over 4 years: stood at $138.8 million in 2022, then tumbled by 61.09% to $54.0 million in 2023, then fell by 25.34% to $40.3 million in 2024, then grew by 9.27% to $44.1 million in 2025.
- Business Quant data shows Construction in Progress for ORGN at $44.1 million in Q4 2025, $61.3 million in Q3 2025, and $63.1 million in Q2 2025.