Growth Metrics

O-I Glass (OI) Construction in Progress (2016 - 2025)

O-I Glass' Construction in Progress history spans 17 years, with the latest figure at $362.0 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 56.59% year-over-year to $362.0 million; the TTM value through Dec 2025 reached $362.0 million, down 56.59%, while the annual FY2025 figure was $362.0 million, 56.59% down from the prior year.
  • Construction in Progress reached $362.0 million in Q4 2025 per OI's latest filing, down from $834.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $834.0 million in Q4 2024 to a low of $300.0 million in Q4 2021.
  • Average Construction in Progress over 5 years is $573.8 million, with a median of $556.0 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: surged 85.33% in 2022, then crashed 56.59% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $300.0 million in 2021, then soared by 85.33% to $556.0 million in 2022, then surged by 46.94% to $817.0 million in 2023, then rose by 2.08% to $834.0 million in 2024, then plummeted by 56.59% to $362.0 million in 2025.
  • Per Business Quant, the three most recent readings for OI's Construction in Progress are $362.0 million (Q4 2025), $834.0 million (Q4 2024), and $817.0 million (Q4 2023).