Growth Metrics

O-I Glass (OI) Construction in Progress (2016 - 2025)

O-I Glass filings provide 17 years of Construction in Progress readings, the most recent being $362.0 million for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 56.59% to $362.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $362.0 million, a 56.59% decrease, with the full-year FY2025 number at $362.0 million, down 56.59% from a year prior.
  • Construction in Progress hit $362.0 million in Q4 2025 for O-I Glass, down from $834.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $834.0 million in Q4 2024 to a low of $300.0 million in Q4 2021.
  • Median Construction in Progress over the past 5 years was $556.0 million (2022), compared with a mean of $573.8 million.
  • Biggest five-year swings in Construction in Progress: soared 85.33% in 2022 and later plummeted 56.59% in 2025.
  • O-I Glass' Construction in Progress stood at $300.0 million in 2021, then soared by 85.33% to $556.0 million in 2022, then surged by 46.94% to $817.0 million in 2023, then rose by 2.08% to $834.0 million in 2024, then plummeted by 56.59% to $362.0 million in 2025.
  • The last three reported values for Construction in Progress were $362.0 million (Q4 2025), $834.0 million (Q4 2024), and $817.0 million (Q4 2023) per Business Quant data.