Growth Metrics

Crown Holdings (CCK) Construction in Progress (2016 - 2025)

Crown Holdings' Construction in Progress history spans 16 years, with the latest figure at $627.0 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 33.69% to $627.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $627.0 million, a 33.69% increase, with the full-year FY2025 number at $627.0 million, up 33.69% from a year prior.
  • Construction in Progress hit $627.0 million in Q4 2025 for Crown Holdings, up from $469.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for CCK hit a ceiling of $844.0 million in Q4 2022 and a floor of $469.0 million in Q4 2024.
  • Historically, Construction in Progress has averaged $628.2 million across 5 years, with a median of $612.0 million in 2021.
  • Biggest five-year swings in Construction in Progress: soared 37.91% in 2022 and later tumbled 30.21% in 2023.
  • Tracing CCK's Construction in Progress over 5 years: stood at $612.0 million in 2021, then soared by 37.91% to $844.0 million in 2022, then tumbled by 30.21% to $589.0 million in 2023, then fell by 20.37% to $469.0 million in 2024, then soared by 33.69% to $627.0 million in 2025.
  • Business Quant data shows Construction in Progress for CCK at $627.0 million in Q4 2025, $469.0 million in Q4 2024, and $589.0 million in Q4 2023.