Quanex Building Products (NX) Construction in Progress (2016 - 2026)
Quanex Building Products (NX) has disclosed Construction in Progress for 16 consecutive years, with $65.6 million as the latest value for Q3 2025.
- On a quarterly basis, Construction in Progress changed N/A to $65.6 million in Q3 2025 year-over-year; TTM through Jul 2025 was $65.6 million, a N/A change, with the full-year FY2024 number at $46.5 million, up 58.69% from a year prior.
- Construction in Progress was $65.6 million for Q3 2025 at Quanex Building Products, up from $60.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $65.6 million in Q3 2025 to a low of $16.1 million in Q4 2021.
- A 5-year average of $42.7 million and a median of $46.5 million in 2024 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 77.04% in 2022, then rose 2.86% in 2023.
- Quanex Building Products' Construction in Progress stood at $16.1 million in 2021, then surged by 77.04% to $28.5 million in 2022, then increased by 2.86% to $29.3 million in 2023, then surged by 58.69% to $46.5 million in 2024, then surged by 40.9% to $65.6 million in 2025.
- Per Business Quant, the three most recent readings for NX's Construction in Progress are $65.6 million (Q3 2025), $60.8 million (Q2 2025), and $51.8 million (Q1 2025).