Navigator Holdings (NVGS) Construction in Progress (2016 - 2025)

Navigator Holdings has reported Construction in Progress over the past 9 years, most recently at $115.3 million for Q4 2025.

  • Quarterly Construction in Progress rose 177.29% to $115.3 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $115.3 million through Dec 2025, up 177.29% year-over-year, with the annual reading at $115.3 million for FY2025, 177.29% up from the prior year.
  • Construction in Progress was $115.3 million for Q4 2025 at Navigator Holdings, up from -$20.6 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $115.3 million in Q4 2025 and troughed at -$20.6 million in Q2 2025.