Navigator Holdings (NVGS) Construction in Progress (2016 - 2025)
Navigator Holdings (NVGS) has disclosed Construction in Progress for 8 consecutive years, with $115.3 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 177.29% to $115.3 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $115.3 million through Dec 2025, up 177.29% year-over-year, with the annual reading at $115.3 million for FY2025, 177.29% up from the prior year.
- Construction in Progress for Q4 2025 was $115.3 million at Navigator Holdings, up from $41.6 million in the prior quarter.
- The five-year high for Construction in Progress was $115.3 million in Q4 2025, with the low at $41.6 million in Q4 2024.