Noble Romans (NROM) Construction in Progress (2016 - 2023)
Historic Construction in Progress for Noble Romans (NROM) over the last 8 years, with Q3 2023 value amounting to $62632.0.
- Noble Romans' Construction in Progress fell 7589.98% to $62632.0 in Q3 2023 from the same period last year, while for Sep 2023 it was $62632.0, marking a year-over-year decrease of 7589.98%. This contributed to the annual value of $63097.0 for FY2022, which is 7315.6% down from last year.
- Per Noble Romans' latest filing, its Construction in Progress stood at $62632.0 for Q3 2023, which was down 7589.98% from $68858.0 recorded in Q2 2023.
- In the past 5 years, Noble Romans' Construction in Progress registered a high of $920696.0 during Q1 2020, and its lowest value of $57774.0 during Q1 2023.
- Its 5-year average for Construction in Progress is $324161.2, with a median of $268589.0 in 2022.
- Per our database at Business Quant, Noble Romans' Construction in Progress skyrocketed by 73840.64% in 2020 and then tumbled by 7848.98% in 2023.
- Over the past 5 years, Noble Romans' Construction in Progress (Quarter) stood at $374525.0 in 2019, then skyrocketed by 36.23% to $510225.0 in 2020, then crashed by 53.93% to $235051.0 in 2021, then plummeted by 73.16% to $63097.0 in 2022, then fell by 0.74% to $62632.0 in 2023.
- Its last three reported values are $62632.0 in Q3 2023, $68858.0 for Q2 2023, and $57774.0 during Q1 2023.