Noble Romans (NROM) Construction in Progress (2016 - 2023)
Noble Romans has reported Construction in Progress over the past 8 years, most recently at $62632.0 for Q3 2023.
- Quarterly results put Construction in Progress at $62632.0 for Q3 2023, down 75.9% from a year ago — trailing twelve months through Sep 2023 was $62632.0 (down 75.9% YoY), and the annual figure for FY2022 was $63097.0, down 73.16%.
- Construction in Progress for Q3 2023 was $62632.0 at Noble Romans, down from $68858.0 in the prior quarter.
- Over the last five years, Construction in Progress for NROM hit a ceiling of $920696.0 in Q1 2020 and a floor of $57774.0 in Q1 2023.
- Median Construction in Progress over the past 5 years was $268589.0 (2022), compared with a mean of $324161.2.
- Biggest five-year swings in Construction in Progress: soared 738.41% in 2020 and later crashed 78.49% in 2023.
- Noble Romans' Construction in Progress stood at $374525.0 in 2019, then skyrocketed by 36.23% to $510225.0 in 2020, then plummeted by 53.93% to $235051.0 in 2021, then tumbled by 73.16% to $63097.0 in 2022, then decreased by 0.74% to $62632.0 in 2023.
- The last three reported values for Construction in Progress were $62632.0 (Q3 2023), $68858.0 (Q2 2023), and $57774.0 (Q1 2023) per Business Quant data.