NCS Multistage Holdings (NCSM) Construction in Progress (2016 - 2026)
NCS Multistage Holdings has reported Construction in Progress over the past 11 years, most recently at $475000.0 for Q1 2026.
- For Q1 2026, Construction in Progress rose 295.83% year-over-year to $475000.0; the TTM value through Mar 2026 reached $475000.0, up 295.83%, while the annual FY2025 figure was $211000.0, 6.64% down from the prior year.
- Construction in Progress for Q1 2026 was $475000.0 at NCS Multistage Holdings, up from $211000.0 in the prior quarter.
- Over five years, Construction in Progress peaked at $916000.0 in Q3 2023 and troughed at $120000.0 in Q1 2025.
- A 5-year average of $454470.6 and a median of $439000.0 in 2022 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: crashed 81.76% in 2025 and later skyrocketed 295.83% in 2026.
- Year by year, Construction in Progress stood at $545000.0 in 2022, then plummeted by 38.17% to $337000.0 in 2023, then tumbled by 32.94% to $226000.0 in 2024, then decreased by 6.64% to $211000.0 in 2025, then soared by 125.12% to $475000.0 in 2026.
- Business Quant data shows Construction in Progress for NCSM at $475000.0 in Q1 2026, $211000.0 in Q4 2025, and $204000.0 in Q3 2025.