NovaBridge Biosciences (NBP) Construction in Progress (2021 - 2022)

NovaBridge Biosciences (NBP) has disclosed Construction in Progress for 2 consecutive years, with $874276.2 as the latest value for Q4 2022.

  • Quarterly Construction in Progress fell 73.51% to $874276.2 in Q4 2022 from the year-ago period, while the trailing twelve-month figure was $874276.2 through Dec 2022, down 73.51% year-over-year, with the annual reading at $901000.0 for FY2022, 72.7% down from the prior year.
  • Construction in Progress for Q4 2022 was $874276.2 at NovaBridge Biosciences, down from $3.3 million in the prior quarter.
  • The five-year high for Construction in Progress was $3.3 million in Q4 2021, with the low at $874276.2 in Q4 2022.