KPIs & Operating Metrics(New)
Growth Metrics

Nathans Famous (NATH) Construction in Progress (2017 - 2025)

Nathans Famous (NATH) has disclosed Construction in Progress for 13 consecutive years, with $6000.0 as the latest value for Q1 2025.

  • Quarterly Construction in Progress changed N/A to $6000.0 in Q1 2025 from the year-ago period, while the trailing twelve-month figure was $6000.0 through Mar 2025, changed N/A year-over-year, with the annual reading at $6000.0 for FY2025, N/A changed from the prior year.
  • Construction in Progress hit $6000.0 in Q1 2025 for Nathans Famous, down from $63000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $112000.0 in Q1 2022 to a low of $6000.0 in Q1 2025.
  • Historically, Construction in Progress has averaged $48250.0 across 4 years, with a median of $37500.0 in 2021.
  • Biggest five-year swings in Construction in Progress: tumbled 84.81% in 2021 and later soared 833.33% in 2022.
  • Year by year, Construction in Progress stood at $12000.0 in 2021, then skyrocketed by 833.33% to $112000.0 in 2022, then plummeted by 43.75% to $63000.0 in 2023, then plummeted by 90.48% to $6000.0 in 2025.
  • Business Quant data shows Construction in Progress for NATH at $6000.0 in Q1 2025, $63000.0 in Q1 2023, and $112000.0 in Q1 2022.