Microvast Holdings (MVST) Construction in Progress (2020 - 2024)
Historic Construction in Progress for Microvast Holdings (MVST) over the last 5 years, with Q4 2024 value amounting to $196.1 million.
- Microvast Holdings' Construction in Progress fell 3907.86% to $196.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $196.1 million, marking a year-over-year decrease of 3907.86%. This contributed to the annual value of $196.1 million for FY2024, which is 3907.86% down from last year.
- Latest data reveals that Microvast Holdings reported Construction in Progress of $196.1 million as of Q4 2024, which was down 3907.86% from $321.9 million recorded in Q4 2023.
- In the past 5 years, Microvast Holdings' Construction in Progress ranged from a high of $321.9 million in Q4 2023 and a low of $57.4 million during Q4 2020
- Moreover, its 5-year median value for Construction in Progress was $195.5 million (2022), whereas its average is $173.6 million.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 10164.58% in 2022, then tumbled by 3907.86% in 2024.
- Quarter analysis of 5 years shows Microvast Holdings' Construction in Progress stood at $57.4 million in 2020, then skyrocketed by 68.95% to $97.0 million in 2021, then skyrocketed by 101.65% to $195.5 million in 2022, then soared by 64.63% to $321.9 million in 2023, then crashed by 39.08% to $196.1 million in 2024.
- Its last three reported values are $196.1 million in Q4 2024, $321.9 million for Q4 2023, and $195.5 million during Q4 2022.