Mitsubishi Ufj Financial (MUFG) Construction in Progress (2017 - 2025)
Mitsubishi Ufj Financial's Construction in Progress history spans 15 years, with the latest figure at $222.7 million for Q1 2025.
- On a quarterly basis, Construction in Progress rose 12.77% to $222.7 million in Q1 2025 year-over-year; TTM through Mar 2025 was $222.7 million, a 12.77% increase, with the full-year FY2025 number at $223.0 million, up 9.91% from a year prior.
- Construction in Progress hit $222.7 million in Q1 2025 for Mitsubishi Ufj Financial, up from $197.5 million in the prior quarter.
- Over the last five years, Construction in Progress for MUFG hit a ceiling of $433.5 million in Q1 2021 and a floor of $197.5 million in Q1 2024.
- Historically, Construction in Progress has averaged $280.4 million across 5 years, with a median of $261.9 million in 2023.
- Biggest five-year swings in Construction in Progress: surged 35.88% in 2021 and later tumbled 33.95% in 2022.
- Tracing MUFG's Construction in Progress over 5 years: stood at $433.5 million in 2021, then plummeted by 33.95% to $286.3 million in 2022, then dropped by 8.51% to $261.9 million in 2023, then dropped by 24.61% to $197.5 million in 2024, then rose by 12.77% to $222.7 million in 2025.
- Business Quant data shows Construction in Progress for MUFG at $222.7 million in Q1 2025, $197.5 million in Q1 2024, and $261.9 million in Q1 2023.