Growth Metrics

Mannatech (MTEX) Construction in Progress (2016 - 2025)

Mannatech's Construction in Progress history spans 17 years, with the latest figure at $913000.0 for Q4 2025.

  • Quarterly results put Construction in Progress at $913000.0 for Q4 2025, up 356.5% from a year ago — trailing twelve months through Dec 2025 was $913000.0 (up 356.5% YoY), and the annual figure for FY2025 was $913000.0, up 356.5%.
  • Construction in Progress for Q4 2025 was $913000.0 at Mannatech, up from $200000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.8 million in Q2 2022 to a low of $194000.0 in Q4 2023.
  • The 5-year median for Construction in Progress is $976000.0 (2021), against an average of $925363.6.
  • The sharpest move saw Construction in Progress tumbled 79.13% in 2022, then skyrocketed 356.5% in 2025.
  • Year by year, Construction in Progress stood at $1.4 million in 2021, then plummeted by 71.43% to $400000.0 in 2022, then tumbled by 51.5% to $194000.0 in 2023, then increased by 3.09% to $200000.0 in 2024, then surged by 356.5% to $913000.0 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $913000.0, $200000.0, and $194000.0 for Q4 2025, Q4 2024, and Q4 2023 respectively.