Growth Metrics

Monolithic Power Systems (MPWR) Work In Process (2016 - 2026)

Monolithic Power Systems' Work In Process history spans 16 years, with the latest figure at $263.1 million for Q1 2026.

  • On a quarterly basis, Work In Process rose 27.33% to $263.1 million in Q1 2026 year-over-year; TTM through Mar 2026 was $263.1 million, a 27.33% increase, with the full-year FY2025 number at $220.4 million, up 29.67% from a year prior.
  • Work In Process hit $263.1 million in Q1 2026 for Monolithic Power Systems, up from $220.4 million in the prior quarter.
  • Over the last five years, Work In Process for MPWR hit a ceiling of $263.1 million in Q1 2026 and a floor of $94.4 million in Q3 2023.
  • Historically, Work In Process has averaged $163.4 million across 5 years, with a median of $155.9 million in 2022.
  • Biggest five-year swings in Work In Process: plummeted 39.44% in 2023 and later soared 93.09% in 2024.
  • Tracing MPWR's Work In Process over 5 years: stood at $134.1 million in 2022, then dropped by 15.9% to $112.8 million in 2023, then soared by 50.76% to $170.0 million in 2024, then increased by 29.67% to $220.4 million in 2025, then increased by 19.35% to $263.1 million in 2026.
  • Business Quant data shows Work In Process for MPWR at $263.1 million in Q1 2026, $220.4 million in Q4 2025, and $210.5 million in Q3 2025.