Taiwan Semiconductor Manufacturing (TSM) Work In Process (2016 - 2018)
Taiwan Semiconductor Manufacturing filings provide 3 years of Work In Process readings, the most recent being $2.3 billion for Q4 2018.
- On a quarterly basis, Work In Process rose 32.08% to $2.3 billion in Q4 2018 year-over-year; TTM through Dec 2018 was $2.3 billion, a 32.08% increase, with the full-year FY2018 number at $2.4 billion, up 36.5% from a year prior.
- Work In Process reached $2.3 billion in Q4 2018 per TSM's latest filing, up from $1.8 billion in the prior quarter.
- The five-year high for Work In Process was $2.3 billion in Q4 2018, with the low at $1.0 billion in Q4 2016.
- A 3-year average of $1.7 billion and a median of $1.8 billion in 2017 define the central range for Work In Process.
- Year-over-year, Work In Process surged 68.84% in 2017 and then surged 32.08% in 2018.
- Year by year, Work In Process stood at $1.0 billion in 2016, then surged by 68.84% to $1.8 billion in 2017, then skyrocketed by 32.08% to $2.3 billion in 2018.
- Per Business Quant, the three most recent readings for TSM's Work In Process are $2.3 billion (Q4 2018), $1.8 billion (Q4 2017), and $1.0 billion (Q4 2016).