Growth Metrics

Mitesco (MITI) Construction in Progress (2020 - 2022)

Mitesco's Construction in Progress history spans 3 years, with the latest figure at $998553.0 for Q3 2022.

  • Quarterly results put Construction in Progress at $998553.0 for Q3 2022, up 236.1% from a year ago — trailing twelve months through Sep 2022 was $998553.0 (up 236.1% YoY), and the annual figure for FY2021 was $2.0 million, up 375.85%.
  • Construction in Progress for Q3 2022 was $998553.0 at Mitesco, up from $943689.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $2.0 million in Q4 2021 to a low of $297097.0 in Q3 2021.
  • The 3-year median for Construction in Progress is $775964.5 (2022), against an average of $874893.7.
  • The sharpest move saw Construction in Progress surged 375.85% in 2021, then surged 236.1% in 2022.
  • Year by year, Construction in Progress stood at $417082.0 in 2020, then surged by 375.85% to $2.0 million in 2021, then crashed by 49.69% to $998553.0 in 2022.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $998553.0, $943689.0, and $608240.0 for Q3 2022, Q2 2022, and Q1 2022 respectively.