Growth Metrics

Mitesco (MITI) Construction in Progress (2020 - 2022)

Mitesco (MITI) has disclosed Construction in Progress for 3 consecutive years, with $998553.0 as the latest value for Q3 2022.

  • On a quarterly basis, Construction in Progress rose 236.1% to $998553.0 in Q3 2022 year-over-year; TTM through Sep 2022 was $998553.0, a 236.1% increase, with the full-year FY2021 number at $2.0 million, up 375.85% from a year prior.
  • Construction in Progress was $998553.0 for Q3 2022 at Mitesco, up from $943689.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $2.0 million in Q4 2021 to a low of $297097.0 in Q3 2021.
  • A 3-year average of $874893.7 and a median of $775964.5 in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: soared 375.85% in 2021, then soared 236.1% in 2022.
  • Mitesco's Construction in Progress stood at $417082.0 in 2020, then skyrocketed by 375.85% to $2.0 million in 2021, then tumbled by 49.69% to $998553.0 in 2022.
  • Per Business Quant, the three most recent readings for MITI's Construction in Progress are $998553.0 (Q3 2022), $943689.0 (Q2 2022), and $608240.0 (Q1 2022).