Verisign (VRSN) Construction in Progress: 2010-2024
- Verisign's Construction in Progress rose 4.97% to $16.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $16.9 million, marking a year-over-year increase of 4.97%. This contributed to the annual value of $16.9 million for FY2024, which is 4.97% up from last year.
- Verisign's Construction in Progress amounted to $16.9 million in Q4 2024, which was up 4.97% from $16.1 million recorded in Q4 2023.
- In the past 5 years, Verisign's Construction in Progress registered a high of $16.9 million during Q4 2024, and its lowest value of $3.1 million during Q4 2021.
- Its 3-year average for Construction in Progress is $13.0 million, with a median of $15.7 million in 2023.
- In the last 5 years, Verisign's Construction in Progress slumped by 36.13% in 2020 and then surged by 347.22% in 2023.
- Quarterly analysis of 5 years shows Verisign's Construction in Progress stood at $4.3 million in 2020, then declined by 28.41% to $3.1 million in 2021, then increased by 16.13% to $3.6 million in 2022, then soared by 347.22% to $16.1 million in 2023, then grew by 4.97% to $16.9 million in 2024.
- Its Construction in Progress stands at $16.9 million for Q4 2024, versus $16.1 million for Q4 2023 and $15.3 million for Q3 2023.