Verisign (VRSN) Construction in Progress (2016 - 2025)
Verisign filings provide 16 years of Construction in Progress readings, the most recent being $12.4 million for Q4 2025.
- Quarterly Construction in Progress fell 26.63% to $12.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $12.4 million through Dec 2025, down 26.63% year-over-year, with the annual reading at $12.4 million for FY2025, 26.63% down from the prior year.
- Construction in Progress hit $12.4 million in Q4 2025 for Verisign, down from $16.9 million in the prior quarter.
- Across five years, Construction in Progress topped out at $16.9 million in Q4 2024 and bottomed at $3.1 million in Q4 2021.
- Average Construction in Progress over 5 years is $11.2 million, with a median of $13.8 million recorded in 2023.
- The largest annual shift saw Construction in Progress decreased 28.41% in 2021 before it surged 347.22% in 2023.
- Verisign's Construction in Progress stood at $3.1 million in 2021, then grew by 16.13% to $3.6 million in 2022, then surged by 347.22% to $16.1 million in 2023, then rose by 4.97% to $16.9 million in 2024, then decreased by 26.63% to $12.4 million in 2025.
- Per Business Quant, the three most recent readings for VRSN's Construction in Progress are $12.4 million (Q4 2025), $16.9 million (Q4 2024), and $16.1 million (Q4 2023).