Verisign (VRSN) Construction in Progress (2016 - 2025)
Verisign has reported Construction in Progress over the past 16 years, most recently at $12.4 million for Q4 2025.
- Quarterly Construction in Progress fell 26.63% to $12.4 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $12.4 million through Dec 2025, down 26.63% year-over-year, with the annual reading at $12.4 million for FY2025, 26.63% down from the prior year.
- Construction in Progress was $12.4 million for Q4 2025 at Verisign, down from $16.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $16.9 million in Q4 2024 and troughed at $3.1 million in Q4 2021.
- The 5-year median for Construction in Progress is $13.8 million (2023), against an average of $11.2 million.
- Biggest five-year swings in Construction in Progress: decreased 28.41% in 2021 and later surged 347.22% in 2023.
- Tracing VRSN's Construction in Progress over 5 years: stood at $3.1 million in 2021, then grew by 16.13% to $3.6 million in 2022, then surged by 347.22% to $16.1 million in 2023, then rose by 4.97% to $16.9 million in 2024, then decreased by 26.63% to $12.4 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $12.4 million, $16.9 million, and $16.1 million for Q4 2025, Q4 2024, and Q4 2023 respectively.