Verisign (VRSN) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Verisign (VRSN) over the last 15 years, with Q4 2024 value amounting to $16.9 million.
- Verisign's Construction in Progress rose 496.89% to $16.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $16.9 million, marking a year-over-year increase of 496.89%. This contributed to the annual value of $16.9 million for FY2024, which is 496.89% up from last year.
- According to the latest figures from Q4 2024, Verisign's Construction in Progress is $16.9 million, which was up 496.89% from $16.1 million recorded in Q4 2023.
- In the past 5 years, Verisign's Construction in Progress registered a high of $16.9 million during Q4 2024, and its lowest value of $3.1 million during Q4 2021.
- In the last 5 years, Verisign's Construction in Progress had a median value of $9.8 million in 2020 and averaged $9.9 million.
- As far as peak fluctuations go, Verisign's Construction in Progress plummeted by 3612.63% in 2020, and later skyrocketed by 34722.22% in 2023.
- Over the past 5 years, Verisign's Construction in Progress (Quarter) stood at $4.3 million in 2020, then decreased by 28.41% to $3.1 million in 2021, then increased by 16.13% to $3.6 million in 2022, then skyrocketed by 347.22% to $16.1 million in 2023, then grew by 4.97% to $16.9 million in 2024.
- Its Construction in Progress was $16.9 million in Q4 2024, compared to $16.1 million in Q4 2023 and $15.3 million in Q3 2023.