Mcgrath Rentcorp (MGRC) Construction in Progress (2016 - 2025)
Mcgrath Rentcorp's Construction in Progress history spans 15 years, with the latest figure at $14.7 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 2.72% year-over-year to $14.7 million; the TTM value through Dec 2025 reached $14.7 million, down 2.72%, while the annual FY2025 figure was $14.7 million, 2.72% down from the prior year.
- Construction in Progress reached $14.7 million in Q4 2025 per MGRC's latest filing, down from $15.1 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $15.1 million in Q4 2024 to a low of $903000.0 in Q4 2022.
- Average Construction in Progress over 5 years is $9.8 million, with a median of $14.7 million recorded in 2025.
- Peak YoY movement for Construction in Progress: plummeted 72.56% in 2022, then skyrocketed 1539.76% in 2023.
- A 5-year view of Construction in Progress shows it stood at $3.3 million in 2021, then plummeted by 72.56% to $903000.0 in 2022, then skyrocketed by 1539.76% to $14.8 million in 2023, then grew by 1.98% to $15.1 million in 2024, then fell by 2.72% to $14.7 million in 2025.
- Per Business Quant, the three most recent readings for MGRC's Construction in Progress are $14.7 million (Q4 2025), $15.1 million (Q4 2024), and $14.8 million (Q4 2023).