Growth Metrics

Mays J W (MAYS) Construction in Progress (2021 - 2025)

Historic Construction in Progress for Mays J W (MAYS) over the last 9 years, with Q4 2025 value amounting to $2.1 million.

  • Mays J W's Construction in Progress rose 1730.51% to $2.1 million in Q4 2025 from the same period last year, while for Oct 2025 it was $2.1 million, marking a year-over-year increase of 1730.51%. This contributed to the annual value of $3.3 million for FY2025, which is 3701.87% up from last year.
  • Per Mays J W's latest filing, its Construction in Progress stood at $2.1 million for Q4 2025, which was up 1730.51% from $3.3 million recorded in Q3 2025.
  • Mays J W's Construction in Progress' 5-year high stood at $3.3 million during Q3 2025, with a 5-year trough of $1.5 million in Q1 2025.
  • Its 5-year average for Construction in Progress is $2.2 million, with a median of $2.2 million in 2021.
  • In the last 5 years, Mays J W's Construction in Progress crashed by 3338.47% in 2023 and then surged by 5266.08% in 2024.
  • Quarter analysis of 5 years shows Mays J W's Construction in Progress stood at $2.4 million in 2021, then dropped by 23.78% to $1.8 million in 2022, then increased by 7.49% to $1.9 million in 2023, then dropped by 6.68% to $1.8 million in 2024, then increased by 17.31% to $2.1 million in 2025.
  • Its Construction in Progress stands at $2.1 million for Q4 2025, versus $3.3 million for Q3 2025 and $2.6 million for Q2 2025.