Mays J W (MAYS) Construction in Progress (2021 - 2026)
Mays J W has reported Construction in Progress over the past 10 years, most recently at $2.2 million for Q1 2026.
- Quarterly results put Construction in Progress at $2.2 million for Q1 2026, up 42.02% from a year ago — trailing twelve months through Jan 2026 was $2.2 million (up 42.02% YoY), and the annual figure for FY2025 was $3.3 million, up 37.02%.
- Construction in Progress for Q1 2026 was $2.2 million at Mays J W, up from $2.1 million in the prior quarter.
- Over the last five years, Construction in Progress for MAYS hit a ceiling of $3.3 million in Q3 2025 and a floor of $1.5 million in Q1 2025.
- Median Construction in Progress over the past 5 years was $2.1 million (2022), compared with a mean of $2.2 million.
- Biggest five-year swings in Construction in Progress: plummeted 33.38% in 2023 and later soared 52.66% in 2024.
- Mays J W's Construction in Progress stood at $1.8 million in 2022, then grew by 7.49% to $1.9 million in 2023, then dropped by 6.68% to $1.8 million in 2024, then rose by 17.31% to $2.1 million in 2025, then rose by 3.5% to $2.2 million in 2026.
- The last three reported values for Construction in Progress were $2.2 million (Q1 2026), $2.1 million (Q4 2025), and $3.3 million (Q3 2025) per Business Quant data.