Masimo (MASI) Construction in Progress (2016 - 2017)
Masimo has reported Construction in Progress over the past 6 years, most recently at $6.4 million for Q4 2017.
- Quarterly results put Construction in Progress at $6.4 million for Q4 2017, down 19.66% from a year ago — trailing twelve months through Dec 2017 was $6.4 million (down 19.66% YoY), and the annual figure for FY2017 was $6.4 million, down 19.66%.
- Construction in Progress for Q4 2017 was $6.4 million at Masimo, down from $7.9 million in the prior quarter.
- Over the last five years, Construction in Progress for MASI hit a ceiling of $25.7 million in Q1 2015 and a floor of $3.4 million in Q4 2013.
- Median Construction in Progress over the past 4 years was $7.1 million (2016), compared with a mean of $10.1 million.
- Biggest five-year swings in Construction in Progress: soared 657.91% in 2015 and later tumbled 72.31% in 2016.
- Masimo's Construction in Progress stood at $3.4 million in 2013, then soared by 657.91% to $25.7 million in 2015, then plummeted by 69.21% to $7.9 million in 2016, then fell by 19.66% to $6.4 million in 2017.
- The last three reported values for Construction in Progress were $6.4 million (Q4 2017), $7.9 million (Q4 2016), and $7.1 million (Q1 2016) per Business Quant data.