Masimo (MASI) Construction in Progress (2016 - 2017)
Masimo has reported Construction in Progress over the past 6 years, most recently at $6.4 million for Q4 2017.
- For Q4 2017, Construction in Progress fell 19.66% year-over-year to $6.4 million; the TTM value through Dec 2017 reached $6.4 million, down 19.66%, while the annual FY2017 figure was $6.4 million, 19.66% down from the prior year.
- Construction in Progress for Q4 2017 was $6.4 million at Masimo, down from $7.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $25.7 million in Q1 2015 and troughed at $3.4 million in Q4 2013.
- A 4-year average of $10.1 million and a median of $7.1 million in 2016 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: skyrocketed 657.91% in 2015 and later crashed 72.31% in 2016.
- Year by year, Construction in Progress stood at $3.4 million in 2013, then skyrocketed by 657.91% to $25.7 million in 2015, then tumbled by 69.21% to $7.9 million in 2016, then dropped by 19.66% to $6.4 million in 2017.
- Business Quant data shows Construction in Progress for MASI at $6.4 million in Q4 2017, $7.9 million in Q4 2016, and $7.1 million in Q1 2016.