Growth Metrics

Intuitive Machines (LUNR) Construction in Progress (2023 - 2025)

Intuitive Machines (LUNR) has disclosed Construction in Progress for 3 consecutive years, with $50.8 million as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 980.85% to $50.8 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $50.8 million through Dec 2025, up 980.85% year-over-year, with the annual reading at $50.8 million for FY2025, 980.85% up from the prior year.
  • Construction in Progress for Q4 2025 was $50.8 million at Intuitive Machines, up from $32.7 million in the prior quarter.
  • The five-year high for Construction in Progress was $50.8 million in Q4 2025, with the low at $4.7 million in Q4 2024.
  • Average Construction in Progress over 3 years is $19.7 million, with a median of $15.3 million recorded in 2024.
  • The sharpest move saw Construction in Progress crashed 65.19% in 2024, then surged 980.85% in 2025.
  • Over 3 years, Construction in Progress stood at $13.5 million in 2023, then plummeted by 65.19% to $4.7 million in 2024, then soared by 980.85% to $50.8 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $50.8 million, $32.7 million, and $28.5 million for Q4 2025, Q3 2025, and Q2 2025 respectively.