Growth Metrics

Intuitive Machines (LUNR) Construction in Progress (2023 - 2025)

Historic Construction in Progress for Intuitive Machines (LUNR) over the last 3 years, with Q3 2025 value amounting to $32.7 million.

  • Intuitive Machines' Construction in Progress rose 19459.46% to $32.7 million in Q3 2025 from the same period last year, while for Sep 2025 it was $32.7 million, marking a year-over-year increase of 19459.46%. This contributed to the annual value of $11.1 million for FY2024, which is 1777.78% down from last year.
  • According to the latest figures from Q3 2025, Intuitive Machines' Construction in Progress is $32.7 million, which was up 19459.46% from $28.5 million recorded in Q2 2025.
  • Over the past 5 years, Intuitive Machines' Construction in Progress peaked at $32.7 million during Q3 2025, and registered a low of $11.1 million during Q3 2024.
  • For the 3-year period, Intuitive Machines' Construction in Progress averaged around $17.7 million, with its median value being $14.7 million (2024).
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 4000.0% in 2024, then soared by 19459.46% in 2025.
  • Over the past 3 years, Intuitive Machines' Construction in Progress (Quarter) stood at $13.5 million in 2023, then dropped by 17.78% to $11.1 million in 2024, then surged by 194.59% to $32.7 million in 2025.
  • Its Construction in Progress was $32.7 million in Q3 2025, compared to $28.5 million in Q2 2025 and $11.1 million in Q1 2025.