Intuitive Machines (LUNR) Construction in Progress (2023 - 2025)
Historic Construction in Progress for Intuitive Machines (LUNR) over the last 3 years, with Q3 2025 value amounting to $32.7 million.
- Intuitive Machines' Construction in Progress rose 19459.46% to $32.7 million in Q3 2025 from the same period last year, while for Sep 2025 it was $32.7 million, marking a year-over-year increase of 19459.46%. This contributed to the annual value of $11.1 million for FY2024, which is 1777.78% down from last year.
- Per Intuitive Machines' latest filing, its Construction in Progress stood at $32.7 million for Q3 2025, which was up 19459.46% from $28.5 million recorded in Q2 2025.
- Intuitive Machines' 5-year Construction in Progress high stood at $32.7 million for Q3 2025, and its period low was $11.1 million during Q3 2024.
- Its 3-year average for Construction in Progress is $17.7 million, with a median of $14.7 million in 2024.
- Per our database at Business Quant, Intuitive Machines' Construction in Progress crashed by 4000.0% in 2024 and then skyrocketed by 19459.46% in 2025.
- Intuitive Machines' Construction in Progress (Quarter) stood at $13.5 million in 2023, then decreased by 17.78% to $11.1 million in 2024, then soared by 194.59% to $32.7 million in 2025.
- Its last three reported values are $32.7 million in Q3 2025, $28.5 million for Q2 2025, and $11.1 million during Q1 2025.